Laserfiche WebLink
<br />E. WA TER SYSTEM <br /> <br />Capital Improvements identified are based upon the City's current five-year <br />Capital Improvements Plan which is adopted with each year's City Budget, known areas <br />of potential development and capacity needed to serve the proposed future growth. The <br />SUE growth in the water service area is projected at approximately 23% over the next <br />ten-years. Identified improvements include major distribution lines, pump stations <br />ground storage reservoirs and elevated tanks. <br /> <br />The additional 14,800 persons projected for the water servioe area will increase <br />the average day demand by 2.4 million gallons per day (MGD), the maximum day <br />demand by 4.2 MGD and the peak hour demand by 8.4 MOD. These values were <br />determined usin,g the historical per capita use from Table 4 below. Existing and proposed <br />facilities were reviewed on this basis of demand. <br /> <br /> <br />Table 4 <br /> <br />Basis of Demand for Water System Analysis <br /> <br />Water Supply <br /> <br />Treatment and Pump <br />Stations <br /> <br />Distribution System <br />Ground Storage <br />Elevated Storage <br /> <br />Average Day <br /> <br />166 ,gallons/day <br /> <br />290 ,gallons/day <br /> <br />580 -gallons/day <br />73 gallons <br />507 gallons <br /> <br />Maximum Day <br /> <br />Maximum Hour <br />Max Day x 6/24 Hours <br />Max Hour - Max Day x 6/24 Hrs. <br /> <br />Exhibit 2 shows the recommended system improvements required over the next <br />ten-years and Table 5 itemizes each project and the project cost. These recommended <br />improvements form the basis for the Water System Impact Fee calculation. The total cost <br />for the water system projects including financing is approximately 65 million dollars. <br /> <br />The utilized capacity costs are a ratio of the total project costs based upon the <br />percent of capacity utilized during the ten-year in1pact fee period from 2002 to 2012. The <br />utilized capacity cost for the recommended improvements is approximately 18 million <br />dollars. Utilized costs for existing facilities with excess capacity were not included in the <br />analysis. <br /> <br />A Water Master Plan is currently underway Wllich will provide a more detailed <br />analysis of facilities required for new development and their utilized capacities. The <br />recommendation of this report is that the C.I.P. and impact fee analysis be updated based <br />upon the more detailed information within the next two years. <br />