My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord 2002-067
San-Marcos
>
City Clerk
>
02 Ordinances
>
2000 s
>
2002
>
Ord 2002-067
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2010 2:25:50 PM
Creation date
6/29/2006 3:21:33 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Ordinances
City Clerk - Type
Code of Ordinances
Number
2002-67
Date
9/25/2002
Volume Book
149
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />F. W ASTEW A TER SYSTEM <br /> <br />Capital Improvements for the wastewater system were identified in the same <br />malll1er as the water system: the City's current five-year Capital Improvements Plan, <br />known areas of potential development and capacity needed to serve the proposed future <br />growth. The SUE growth in the wastewater service area is projected at approximately <br />28% over the next ten-years. Identified improvements include new interceptor mains lift <br />stations and force mains. <br /> <br />The additional 14,800 persons projected for the water service area will increase <br />the average day flow by 1.7 million gallons per day (MOD), the maximum month flow <br />by 2.2 MGD and the peak hour flow by 4.4 MOD. These values were determined using <br />the historical per capita use from Table 6 below. Existing and proposed facilities were <br />reviewed on this basis of demand. <br /> <br /> <br />Table No.6 <br />Basis of Demand for Wastewater System Analysis <br /> <br /> A verage Day 115 gallons/day <br />Treatment Plant Maximum Month 150 gallons/day <br />Treatment Plant Maximum Hour 300 gallons/day <br />Collection System Peak Dry Weather (PDW) 225 gallons/day <br />Collection System Peak Wet Weather = PDW + 225 gallons/day + III <br />1&1 <br /> <br />Exhibit 4 shows the recommended system improvements required over the next <br />ten-years for the wastewater service area and Table 7 itemizes each project and the <br />project cost. These recommended improvements form the basis for the Wastewater <br />System Impact Fee calculation. The total cost for the wastewater system projects <br />including financing is approximately 84 million dollars. <br /> <br />The utilized capacity costs are a ratio of the total project costs based upon the <br />percent of capacity utilized during the ten-year impact fee period from 2002 to 2012. The <br />utilized capacity cost for the recommended improvements is approximately 19.9 million <br />dollars. Utilized costs for existing facilities with excess capacity were not included in the <br />analysis. <br /> <br />A Wastewater Master Plan is currently planned for the next fiscal year, which will <br />provide a more detailed analysis of facilities required for new development and their <br />utilized capacities. The recommendation of this report is that the C.I.P. and impact fee <br />analysis be updated based upon the more detailed information within the next two years. <br />
The URL can be used to link to this page
Your browser does not support the video tag.