Laserfiche WebLink
<br />SAN MARCOS LIFT STATION RELOCATION PROJECT <br /> <br />Exhibit 3 <br /> <br />PRELIMINARY ENGINEERING <br /> <br /> FRINGE and <br />Direct Labor Rates & Multipliers PRINCIPAL PROJ. MGR. ENGR. TECH. CLER. G&A MULT, <br /> 58 42 26 20 15 2.15 <br /> <br />LABOR ESTIMATE <br /> <br />!TASK II PRINCIPAL I P. MGR. I ENGR. I TECH. I CLER. I TOTAL I <br />1. Site Visit 4 4 8 <br />2. Obtain and review Evaluation Report 1 4 20 1 26 <br />3. Obtain and review lift station study 1 4 5 <br />4. Kick-off meeting 1 4 4 1 10 <br />5. Conduct progress meetings 16 16 32 <br />6. Lift station site selection 2 4 2 8 <br />7. Coordination meeting with TxDOT 1 4 4 12 21 <br />8. Coordinate permitting requirements 1 2 3 <br />9. Define required easements 4 8 12 24 <br />10. Meet wI operations re: SCAD A & features 2 2 1 5 <br />11. Review gravity lines and lift station hydraulics 1 4 24 2 31 <br />12. Define geotech scope of work 1 2 4 1 8 <br />13. Define survey scope of work 1 2 4 1 8 <br />14. Perform environmental field investigation 1 2 16 8 2 29 <br />15. Evaluate odor problems 1 1 2 4 <br />16. Prepare estimate of construction cost 1 4 12 1 18 <br />17. Prepare letter report & submit to City 2 4 16 16 4 42 <br />18. Review Report wi City 4 4 8 <br /> TOTAL HOURS 11 65 150 52 12 290 <br /> DIRECT LABOR TOTALS $638 $2,730 $3,900 $1,040 $180 $8,488 <br /> FRINGE & GENERAUADMIN, COSTS $1,372 $5,870 $8,385 $2,236 $387 $18,249 <br /> TOTAL LABOR COSTS $2,010 $8,600 $12,285 $3,276 $567 $26,737 <br /> <br /> <br />NON-LABOR ESTIMATE <br />TEM <br />elephone <br />ileage <br />ntemal Printing (8.5x11 photocopies) <br />ourier <br /> <br /> <br />TOTAL <br />$20 <br />$146 <br />$50 <br />$27 <br />$223 <br /> <br />SUBCONTRACTORS SERVICES ESTIMATE <br />BCONTRACTOR <br /> <br /> <br />U1vcon <br />rofessional Services Industries <br />OTAL <br /> <br /> <br />I!TOTAL FEE ESTIMATE <br /> <br />I $63,685 II <br /> <br />PW\Sun Communities\sanmarcosls-fee (rev2)-client <br />