Laserfiche WebLink
<br />ARTICLE 2 <br />THE CITY'S RESPONSIBILITIES <br /> <br />The City will: <br /> <br />2.1 Provide full information to the Engineer regarding the City's requirements for the Engineer's <br />services under this Agreement. The City will furnish the Engineer with copies of official City design <br />standards and construction standards, and other data and information in the City's possession needed <br />by the Engineer at the Engineer's request. <br /> <br />2.2 Designate Sabas A vila as the City's Project Manager and authorized representati ve to act on <br />the City's behalf with respect to this Agreement. The City will examine the documents and <br />information submitted by the Engineer and promptly render responses to the Engineer on issues <br />requiring a decision by the City. <br /> <br />2.3 Provide access to and make all necessary provisions for the Engineer to enter public and <br />private property as required for the Engineer to perform its services under this Agreement. <br /> <br />2.4 Bear all costs incident to this Article. <br /> <br />2.5 Assist the Consultant with coordinating traffic control measures for the surveying and <br />geotechnical investigation work, if needed. <br /> <br />2.6 Provide rights of access onto private property. <br /> <br />2.7 Provide water and wastewater record as-built plans and available city topographic maps, <br />tight-of-way maps and similar data. <br /> <br />2.8 Provide G.P.S. control points as horizontal and vertical control (NA VD 83) in the proximity <br />of Post Road, as well as seed files and symbol libraries for Microstation processing by the <br />Consultant. <br /> <br />2.9 Furnish the City's latest bid tabulations for use in preparing the estimate. The Consultant <br />will also utilize available TxDOT bid data. <br /> <br />ARTICLE 3 <br />CONSTRUCTION COST <br /> <br />3.1 DEFINITION <br /> <br />3.1.1 The construction cost will be the total cost or estimated cost to the City of all elements of the <br />Project designed or specified by the Engineer. <br /> <br />Baker Aicklen.wpd <br /> <br />9 <br />