My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2002-201
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2002
>
Res 2002-201
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2006 4:00:32 PM
Creation date
6/29/2006 3:59:58 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2002-201
Date
10/28/2002
Volume Book
149
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Attachment B <br />ST ANDARD RATE SCHEDULE <br />(Labor Rate Table 35) <br /> <br />Effective September, 2000, the following rates are recommended for work performed on an hourly- <br />charge basis. Rates include company overhead and profit for services accomplished during regular <br />working hours. <br /> <br />DIRECT LABOR <br />OFFICE PERSONNEL SERVICES <br /> <br />Classification Rates <br />Project Engineer /Surveyor/Planner .............. ....... ............. ................... ..................... $110.00 per hour <br />Staff Engineer/Surveyor/Planner.................................................................................. $95.00 per hour <br />Project Designer/Coordinator..................................................................................... $85.00 per hour <br />Engineering Assistant/Surveying Assistant/GPS Processor ....................................... $70.00 per hour <br />Senior Engineering/Surveying CAD Technician ....................................................... $60.00 per hour <br />Engineering/Surveying CAD TechnicianIField Representative ................................. $55.00 per hour <br />CAD Draftsman .......................................................................................................... $45.00 per hour <br />Secretary ................................................................................... .................................. $45.00 per hour <br />Expert Witness/Testimony/Deposition Services ...................................................... Two Times Rates <br />Principal (as appropriate) ......................................................................................... $120.00 per hour <br /> <br />FIELD PARTY SERVICES Rates <br />1- Man Field Party ....................................................................................................... $70.00 per hour <br />2- Man Field Party ....................................................................................................... $95.00 per hour <br />3- Man Field Party ..................................................................................................... $120.00 per hour <br />4-Man Field Party ..................................................................................................... $145.00 per hour <br />GPS Field Unit with Operator (Note 5) .................................................................... $100.00 per hour <br />GPS Field Unit without Operator (Note 5) ................................................................. $60.00 per hour <br /> <br />DIRECT EXPENSES <br /> <br />Transportation: <br />By Firm's Passenger Vehicles (Note 1) ................................................................... $ 0.35 per mile <br />By Firm's Survey Trucks (Notes 1,2,3 & 4) .......................................................... $ 0.35 per mile <br />Subsistence of out-of-city work ................................................................................. $100.00 per day <br />Reproduction & Printing by Firm, ............................................................................ Prevailing Com- <br />Survey Stakes, Lathes, Iron Rods .......................................................................... mercial Rates Or <br />and other Direct Expense ....................................................................................... Cost, Plus 10% <br /> <br />Notes: <br />1. A mileage charge will be billed for projects exceeding a 50-mile radius of the base office only. <br />2. Field Party rates include conventional equipment, supplies and survey vehicles. Abnormal use <br />of stakes, lathes, etc., used such as during the construction phase of a project will be charged <br /> <br />Baker Aicklen.wpd <br /> <br />18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.