My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2011-078
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2011
>
Res 2011-078
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2011 4:17:55 PM
Creation date
7/1/2011 10:53:08 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Date
6/21/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
a <br />*Cost does not include: <br />A: Easements costs <br />B: Comm/TV OH to URD design costs <br />C: Comm/TV conduit and equipment (convert OH to URD) <br />Exhibit B (cont'd.) <br />TEXAS STATE UNIVERSITY <br />SHARE OF COST <br />IN PROJECT SCOPE OF WORK <br />UNIVERSITY DRIVE <br />Removal of existing 3 -ph Overhead Primary conductor, poles and Street <br /># 1 Lighting on TSU side of street ( Between C. M. Allen and LBJ ) <br />Removal of existing 3 -ph Overhead Primary conductor Tap that feeds <br /># 2 Back Alley (Between LBJ and Edward Gary St.) <br />Removal of existing 3 -ph Overhead Primary conductor Tap <br />#3 that feeds Broadway Bank (Moon St.) <br />Removal of existing 1 -ph Overhead Primary conductor Tap that feeds <br />#4 Restaurant at corner of C. M. Allen and University Dr. <br />Installation of new TxDOT Lighting assemblies on opposite side of <br />#5 University Dr. (Underground construction) <br />HUTCHINSON ST. <br />Removal of existing 3 -ph Overhead Primary conductor and poles <br /># 1 between C. M. Allen and LBJ <br />Installation of new Primary and Secondary Underground conduit, <br /># 2 conductor and equipment between C. M. Allen and LBJ. <br />Installation of 2 -4" PVC Spare Conduit from URD Primary <br /># 3 Riser Poles to LBJ St. <br />Install URD Primary Taps to existing 3 -Phase Conductor in Back Alleys, <br /># 4 adjacent streets, and along Hutchison St. <br />LBJ ST. <br />Installation of new Primary and Secondary Underground conduit, <br />conductor <br /># 1 and equipment from Hutchison St. to TSU Campus. <br />Installation of 2 -4" PVC Spare Conduit from Hutchison St. to TSU <br />#2 Campus. <br />Install URD Primary Taps to existing 3 -Phase Overhead Conductor <br />#3 along Hutchinson St. and LBJ. <br />TOTAL <br />LENGTH/ <br />EACH $ /UNIT TOTAL <br />1475 $10.00 $14,750.00 <br />300 $10.00 $3,000.00 <br />170 $10.00 $1,700.00 <br />132 $5.00 $660.00 <br />10 $3,099.63 $30,996.25 <br />900 <br />$5.00 <br />$4,500.00 <br />850 <br />$323.50 <br />$274,975.00 <br />800 <br />$26.44 <br />$21,152.00 <br />1150 <br />$289.05 <br />$332,407.50 <br />825 <br />$323.50 <br />$266,887.50 <br />600 <br />$26.44 <br />$15,864.00 <br />365 $289.05 $105,503.25 <br />$1,072,395.50 <br />15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.