Laserfiche WebLink
<br />1.5.2 Additional services will be provided by Consultant if authorized by the City on the <br />Authorization of Change in Services Form attached to this Agreement as Exhibit A. Compensation <br />will be in addition to that specified for Basic Services. The approval of the City's governing body <br />is necessary for all additional services the compensation for which exceeds $15,000. <br /> <br />ARTICLE 2 <br />THE CITY'S RESPONSIBILITIES <br /> <br />The City will: <br /> <br />2.1 Provide full information to the Consultant regarding the City's requirements for the <br />Consultant's services under this Agreement. The City will furnish the Consultant with copies of <br />official City design standards and construction standards, City right-of-way maps, property deed <br />records, and similar data, G.P.S. control points as horizontal and vertical control (NA VD 83) in the <br />Project area, and other data and information in the City's possession needed by the Consultant at <br />the Consultant's request. <br /> <br />2.2 Provide seed files and symbol libraries for Microstation processing by the Consultant. <br /> <br />2.3 Provide access to and make all necessary provisions for the Consultant to enter public and <br />private property including notification to property owners as required for the Consultant to perform <br />its services under this Agreement. <br /> <br />2.4 Provide right-of-way maps of North LBJ Drive, including individual property deed records. <br /> <br />2.5 Provide as-built existing water and wastewater utility data. <br /> <br />2.6 Designate Richard Medina, Public Works Coordinator, as the City's Project Manager and <br />authorized representative to act on the City's behalf with respect to this Agreement. The City will <br />examine the documents and information submitted by the Consultant and promptly render <br />responses to the Consultant on issues requiring a decision by the City. <br /> <br />2.7 The City will bear all costs incident to this Article. <br /> <br />ARTICLE 3 <br />CONSTRUCTION COST <br /> <br />3.1 DEFINITION <br /> <br />3.1.1 The construction cost will be the total cost or estimated cost to the City of all elements of <br />the Project designed or specified by the Consultant. <br /> <br />9 <br /> <br />NEIGHB0R2002 <br />