Laserfiche WebLink
2.3 "Effective Date" means the later of the dates on which Licensee and SCPDC have signed <br />this Agreement. <br />2.4 "Equipment" means the computer system, including peripheral equipment and operating <br />system software, specified in Schedule B. <br />2.5 "Major and Minor Updates" means updates, if any, to the SCPDC Software. Major <br />Updates involve additions of substantial functionality while Minor Updates do not. Major <br />Updates are designated by a change in the number to the left of the decimal point of the number <br />appearing after the product name while Minor Updates are designated by a change in such <br />number to the right of the decimal point. Example, My Permit Now version X.0 (major update) <br />and My Permit Now version O.Y (minor update). SCPDC is the sole determiner of the <br />availability and designation of an update as a Major or Minor Update. Where used herein <br />"Updates" shall mean Major or Minor Updates interchangeably. <br />2.6 "Site" means each physical location or each Internet link accessible by end -users through <br />Licensee's Web Site, from which Licensee and its customers are authorized to use the Software. <br />2.7 "Software" means the computer software programs specified in Schedule A and <br />otherwise provided for Licensee use pursuant to this Agreement. <br />2.8 "Use" means loading, utilization, storage or display of the Software by Licensee for its <br />own internal information processing, and utilization by end users accessing Licensee's Web Site <br />through the Internet. <br />2.9 "Permit" means any type of permit, including but not limited to, new construction permit, <br />building permit, structure renovation permit, mechanical permit, plumbing permit, gas permit, <br />electrical permit, and sign permit. Multiple permits listed under one number shall not be <br />considered a single permit when calculating funds owed SCPDC pursuant to the terms of the <br />Cooperative Endeavor Use Agreement. Permits that are marked as void using the "void" check <br />box on the project details page and that have not been issued to a outside entity will not be <br />considered in the permit volume count. <br />2.10 "Actionable Project" means any project or case that is tracked by a unique project <br />number within the code enforcement module that has had a work order assigned to it and /or has <br />had photo or other miscellaneous documents uploaded and appended to it. <br />2.11 "Non- Actionable Project" means any project or case that is tracked by a unique project <br />number within the code enforcement module that has not had a work order assigned to it and/or <br />has not had photos or other miscellaneous documents uploaded and appended to it. Furthermore <br />the project should be in a state of soft deletion, void status, or closed status. Stored comments as <br />to why no action is being taken and information entered into the fields available on the form are <br />allowed and will not change its state to actionable. Reporting on a "non- actionable project" does <br />not change the project status to an "actionable" project. <br />Section 3. License. Deliverables and Conies and Acceptance <br />K <br />