My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord 2001-077
San-Marcos
>
City Clerk
>
02 Ordinances
>
2000 s
>
2001
>
Ord 2001-077
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2008 1:41:22 PM
Creation date
7/10/2006 3:34:05 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Ordinances
City Clerk - Type
Code of Ordinances
Number
2001-77
Date
10/8/2001
Volume Book
145
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />director will apply the impervious cover limitation for the entire tract of property, including <br />those portions already developed, to the application. <br /> <br />Sec. 94.525. Requirements and standards for construction, maintenance and operation of <br />BMPs. <br /> <br />(a) If impervious cover at the site of a development regulated activity in the recharge zone is <br />expected to equal~ or exceed~ 15 percent on the approved aquifer protection plan for upon final <br />completion of the development project for 'llhich the regulated activity is being performed, <br />permanent BMPs must be installed in accordance with the approved aquifer protection plan <br />subdivision construction plans or an approved development plat in order to mitigate the water <br />quality impacts of the development. The permanent BMPs must limit the increase in the total <br />suspended solids load in drainage from the site that results from the development to no more <br />than 20 percent above that which would occur from natural drainage from the site. <br /> <br />(b) All temporary and permanent BMPs required called for in the approved aquifer j)rotection <br />plan subdivision construction plans or development plat must be constructed, operated and <br />maintained in accordance with the standards, criteria and requirements in the TNRCC Edwards <br />Aquifer rules and the TNRCC BMP guidance manual. <br /> <br />See. 94.526. Responsibility for compliance. <br /> <br />(a) The holder of the approved subdivision construction plans or development plat is <br />responsible for compliance with this article and the terms and conditions of the approved plans <br />or plat, including the construction, operation and maintenance of all tcmporary BMPs and <br />permanent BMPs shown on the approved plans or plat or described in the accompanying <br />technical report, through all phases of implemcntation. The holder is rcsponsible for notifying <br />all persons engaged in regulated activities on the site of the requirements of this article and the <br />terms and conditions of the approved plans or plat, including the construction, operation and <br />maintenance of all temporary BMPs and pcrmanent BMPs shovm on the approved plans or plat <br />or described in the accompanying technical report. .\ny failure to comply \vith any provision of <br />this article or any term or condition of the approval by any person engaged in ',york on a <br />regulated activity on the site '-"ill constitute a violation of this section by the holder and will <br />subject the holder to enforcement under section 91.511. <br /> <br />(b) .\ny person engaged in work on a regulated activity who violates any provision of this <br />article or any term or condition of the appro'/al of the subdivision construction plans or a <br />development plat for the activity, including the construction, operation and maintenance of all <br />temporary BMPs and permanent BMPs shovm on the approved plans or plat or described in the <br />accompanying technical report, violates this section and is subjcct to enforcement under section <br />91.511. <br /> <br />Sec. 94.527. Responsibility for maintenanee of permanent BMPs. <br /> <br />(a) The holder shall be responsible for maintaining the permanent BMPs after construction until <br />such time as the maintenance obligation is either assumed in writing by another entity having <br /> <br />C:\TEMP\Edwards Regulations revision tinal.doc <br /> <br />38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.