Laserfiche WebLink
AUTHORIZATION OF CHANGE IN SERVICES <br />CITY OF SAN MARCOS, TEXAS <br />PROJECT: Streets and Drainage On Call Services <br />CONSULTANT: HNTB Corporation <br />AUTHORIZATION NO.: 3 <br />ORIGINAL CONTRACT DATE: March 3, 2009 <br />AUTHORIZATION DATE: <br />Additional funds are required for design, bidding and construction administration <br />services on the Hutchison Street and Drainage Improvements Project. This addition <br />inxmlvoc a/rdriitinnal cY�nnp fnr ir�nrrtnnrtrJ „I.. ay ,d,.,.'.�.... i.. .. ,.1 t� •_._ i••i. _ <br />vvN.. Zvi n1%,�ccl'? U rvaUVVay UGalyl1, WcWul d WdSIC Wdttl Ullllly <br />design, traffic signal design, reuse waterline design, street lighting design, coordination <br />with electrical designer, and alley reconstruction design <br />Previous contract amount: <br />Net increase /decrease in contract amount: <br />Revised contract amount: <br />Requested by: <br />Consultant- <br />Glenn G. Greqorv, Jr. P.E.. Vice President <br />HNTB Corporation <br />Approved by: <br />City of an Marcos: <br />by: <br />Jame R. Nuse, P. E,, City Manager <br />08/09/11 <br />Date: � /f /f / <br />Date: l <br />$600,862.00 <br />$279,358.00 <br />$880,220.00 <br />