Laserfiche WebLink
<br />I <br /> <br />I <br /> <br />I <br /> <br />LIST OF ESTIMATED NON-PROJECT COST ITEMS <br /> <br />Zone non-project costs include those development items that will be funded by <br />the developer for which no tax increment reimbursement is expected. These non- <br />project development items and their associated costs are shown in Table B <br /> <br />Table B <br />Non-Project Costs <br /> <br />(All Standard reinvestment zone project costs will be inserted here and will include all <br />base-line infrastructure costs associated with the development. Streets, water, waste <br />water, drainage, detention, landscaping, lands dedicated for public purposes, including <br />an elementary school facility will be included in the list. Awaiting the information from <br />Carma) <br /> <br />STATEMENT OF METHOD OF RELOCATING PERSONS TO BE DISPLACED AS A <br />RESULT OF IMPLEMENTING THE PLAN <br /> <br />The property included in the proposed Zone is vacant and there will be no displacement <br />of current residents <br /> <br />Page 5 of27 of Exhibit C <br /> <br />5 <br /> <br />1/31/05 <br />