Laserfiche WebLink
<br />PROFESSIONAL ENGINEERING FEE CALCULATIONS <br />based on '~ethod Related to Construction Costs' <br />P<OFESSIONAL ENGINEERING SERVICES <br />A Guide to the Selection and Negotiation Process <br /> <br />11- q~w <br /> <br />1993 <br /> <br />A joint publication of the <br />Consulting Engineers Council of Texas <br />and <br />Texas Society of Professional Engineers <br /> <br />HOLLAND STREET RECONSTRUCTION (UPDATED 11/09/99) <br /> <br />TECHNICAL FACTORS <br />1. Level of information required on plans/drawings <br />2. Project requirements <br />3. Existing data <br /> <br />0.00 <br />-0,02 <br />0.00 <br /> <br />OWNER CONTROLLED FACTORS <br />1, Risk/liability (base standard of risk limited to fee) 0.00 <br />2, Time required for owner review/approvals 0.00 <br />3. Number of submittals/owner reviews 0,00 <br />4. Schedule for completing work 0.00 <br />5, Payment schedule 0.00 <br />6. Owner requested subconsultants 0.02 <br />7. Owner participation in project/partnering 0,00 <br />8. Construction inspection limiting participation of engineer 0,03 <br /> <br />EXTERNAL FACTORS <br />1. Coordination with other entities <br />2. Environmental regulations <br />3. 'Not in my back yard'/Citizen's involvement <br />4. Governmental constraints <br /> <br />o . 00 <br />o . 00 <br />0,00 <br />0.00 <br /> <br />TOTAL FEE FACTOR 0.03 <br /> <br />TOTAL CONSTRUCTION COST <br />FEE PERCENTAGE <br />TJTAL FEE <br /> <br />tl,150,598 <br />12,34 <br />$141,934 <br /> <br />STEPHEN RA"SEY, P.E. <br />