Laserfiche WebLink
<br />Baker-Aielden & Associates, Inc. <br />June 3. 1999 <br />PSI Proposal No. 301-9084 <br />Page Four of Seven <br /> <br />PROJECT COST BREAKDOWN <br /> <br /> Item Quantity Unit Price Total <br />1. Boring Layout and Drilling 7 40.00 280.00 <br /> Monitoring (hr) <br />2. Soil/Rock Augering (ft) 80 11.00 880.00 <br />3. Soi1/Rock Sampling (ea) 40 8.00 320.00 <br />4. Atterberg Limits (ea) 10 42.00 420.00 <br />5. Unconfined Compression 4 45.00 180.00 <br /> and Dry Unit Weight <br /> Tests (ea) <br />6. Project Engineer (hr) 21 70.00 1470.00 <br />7. Senior Engineer (hr) 10 90.00 900.00 <br /> TOTAL ESTIMATED <br /> PROJECT COST $4,450.00 <br /> <br />rn;;;';' <br />f,~ <br />