Laserfiche WebLink
<br />~~J. Baker-Aicklen <br />~ & Associates, Inc. <br />Engineers/Surveyors <br /> <br />HOLLAND STREET RECONSTRUCTION PROJECT <br />Preliminary Engineering Phase <br />Actual Manpower and Costs To Date <br />(Through 01/09/00) <br /> <br /> Manpower Hourly <br />Staff (Hours ) Rate Cost <br />Principal 1.0 $100.00 $ 100.00 <br />Project Engineer 19.5 100.00 1,950.00 <br />Staff Engineer 119.0 85.00 10,115.00 <br />Project Designer 309.5 70.00 21,665.00 <br />Senior CAD Technician 362.0 55.00 19,910.00 <br />CAD Technician 232.5 50.00 11,625.00 <br />Clerical 16.0 45.00 720.00 <br />2-Man Survey Crew 21.0 90.00 1.890.00 <br /> Sub-Total $67,975.00 <br /> Subconsultant Fees $ 3,653.00 <br /> Reimbursables 80.00 <br /> <br />TOTAL Actual Cost To Date <br /> <br />$71,708.00 <br />