My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2011-127
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2011
>
Res 2011-127
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2018 10:45:36 AM
Creation date
10/26/2011 3:58:28 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
Number
2011-127
Date
10/18/2011
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
415
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Edwards Aquifer Recovery Implementation Program HABITAT CONSERVATION PLAN <br /> <br />4-46: San Marcos Salamander Densities per Sample Area in the San Marcos System <br /> Over Time (2002-2010) 4-133 <br /> <br />4-47: Habitat Quality Ranking for San Marcos Salamander Densities 4-134 <br /> <br />4-48: Total San Marcos Salamanders within Sample Reaches for Both the HCP <br /> and No Action BaselineSan Marcos System 4-137 <br /> <br />4-49: Total San Marcos Salamanders within Samples Areas Predicted for Current, <br /> HCP, and No Action Baseline Scenarios 4-139 <br /> <br />5-1: Summary of Minimization and Mitigation Measures Included in the <br /> Phase I Package 5-2 <br /> <br />5-2: Acre-Feet of Interest in VISPO by County 5-5 <br /> <br />5-3: Flow-Split Management for Old and New Channels 5-11 <br /> <br />5-4: Reductions in Surface Water Diversion Rates during Low Flow Conditions <br /> -3865 and 18-3866 5-35 <br /> <br />5-5 Number of Occurrences of Springflow Below Selected Thresholds (1947-2000) 5-46 <br /> <br />5-6: Monthly Average Springflow for Selected Statistics (1947-2000) 5-47 <br /> <br />5-7: Springflow Occurrences Below Selected Thresholds with Phase I <br /> And Phase II Measures (1946-2000) 5-50 <br /> <br />5-8: Springflow for Selected Conditions with Phase I and Phase II Mesures <br /> (1947-2000) 5-51 <br /> <br />7-1: Annualized Implementation Costs 7-3 <br /> <br />8-1: Changed Circumstances and Response Measures 8-2 <br /> <br />APPENDICES <br />A: Memorandum of Agreement for the Edwards Aquifer Recovery Implementation Program <br />with the United States Fish and Wildlife Service, 2008 <br /> xiii <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.