Laserfiche WebLink
<br />Section 1.02. Metering Equipment. Hays Energy will obtain, install and convey to the City <br />metering equipment and devices which meet standard City specifications for measuring within a <br />tolerance of2% (the "Accuracy Tolerance") the quantity of Wastewater delivered to the point (the <br />"Transfer Point") where the transmission pipeline for the Wastewater crosses the property line of the <br />site of the Facility, together with devices and equipment of standard type for the proposed <br />application to limit, measure, and record the rate of flow at the Transfer Point, to prevent the <br />backflow of water or the contamination of water in the Citis distribution system, and to protect and <br />secure the metering equipment and other devices. <br /> <br />Section 1.03. Maintenance and Testing of Metering Equipment. <br /> <br />A. The City will maintain the metering equipment within the Accuracy Tolerance, and will <br />test the metering equipment for accuracy at least once every 12 months. <br /> <br />B. Hays Energy may have the metering equipment independently tested at its own cost with <br />48 hours notice to the City. The City may attend any such test. If a test shows an inaccuracy in the <br />metering equipment, the City shall adjust the monthly billing of a period extending back to the time <br />when the inaccuracy began if such time is ascertainable, or if such time is not ascertainable, for a <br />period extending back to the last test of the metering equipment or 120 days, whichever is shorter, <br />in accordance with the percentage of inaccuracy found during the test, whether above or below the <br />correct volume. In the event the meter fails to register for any period, the City shall calculate the <br />usage during the time of meter failure to be the amount of Wastewater furnished during the same <br />period of the previous year, or as otherwise mutually agreed upon by the parties. The City shall <br />recalibrate or replace any inaccurate metering equipment at its expense. <br /> <br />Section 1.04. Alternative Process; Treatment Plant Modifications. <br /> <br />A. Intentionally omitted. <br /> <br />B. Intentionally omitted. <br /> <br />Section 1.05. Billing. The City will furnish Hays Energy with an itemized monthly billing <br />statement showing I) the volume of Wastewater measured at the Transfer Point in 1,000 gallon <br />increments and the amounts due for Routine Treatment of the Wastewater; and 2) the amount of any <br />surcharge due under the City's industrial wastewater discharge regulations. <br /> <br />Article 2. Obligations of Hays Energy <br /> <br />Section 2.01. Payments. <br /> <br />A. Hays Energy will pay to the City the applicable rate for wastewater for the Routine <br /> <br />2 <br />