Laserfiche WebLink
<br />contract must be covered by workers' compensation insurance. <br /> <br />D. The City will have the right to inspect the Wastewater Line during the process of <br />construction, and upon completion. Upon acceptance ofthe completed Wastewater Line by the City, <br />Hays Energy will convey title to the Wastewater Line and all easements to the City, free and clear <br />of any liens, and Hays Energy will assign all permits for the Wastewater Line to the City. <br /> <br />E. Hays Energy will dispose only of process wastewater from the Facility through the <br />Wastewater Line, and the City will not permit any connections to be made to the Wastewater Line <br />for the disposal of untreated wastewater without the written consent of Hays Energy. <br /> <br />Section 2.03. Facility Design, Construction and Operation. Hays Energy will design, construct <br />and operate the Facility so that routine discharges of the Wastewater are treated and disposed of <br />through zero liquid discharge equipment at the Facility. Hays Energy will utilize all commercially <br />reasonable efforts to construct, maintain and operate its zero discharge equipment in fully functional <br />condition at all times, and to discharge the Wastewater to the Wastewater Line only during periods <br />in which Hays Energy's zero liquid discharge equipment is not operational. Hays Energy agrees to <br />use all reasonable means to keep the duration of such periods to a minimum. When discharge of the <br />Wastewater by Hays Energy to the Wastewater Line is necessary, Hays Energy will provide <br />immediate notice to the City's wastewater treatment plant personnel, and will ensure that the <br />Wastewater discharged at the Transfer Point meets the following parameters: <br />Characteristic Parameter <br />V olume Not more than 500,000 gallons per day <br />Temperature Not more than 880 F <br /> <br />The Wastewater discharged at the Transfer Point must meet all applicable requirements of the Laws <br />and Regulations (as defined below) governing wastewater flows to the Treatment Plant. The parties <br />anticipate that the Routine Treatment may not be sufficient for adequate treatment of the <br />Wastewater, and Hays Energy agrees to have pretreatment facilities and processes in place to meet <br />the City's industrial wastewater discharge regulations prior to initiating discharge of the Wastewater <br />to the Wastewater Line. <br /> <br />Article 3. Miscellaneous Provisions. <br /> <br />Section 3.1)1. Conditions Precedent. <br /> <br />A. Intentionally omitted. <br /> <br />B. The City's provision of wastewater treatment services under this Contract is contingent <br />on the satisfactory completion of the construction of the Wastewater Line by Hays Energy. <br /> <br />4 <br />