Laserfiche WebLink
VEGATATION CONTROL, DEBRIS REMOVAL, AND LANDSCAPE MAINTENANCE FOR SAN MARCOS FY2012 <br />Description <br />PROPOSED <br />FY2012 <br />Downtown Alleys mow, trim, and <br />Cycles <br />Square Feet <br />Proposed Rate <br />Total Amt <br />litter pickup (Atch1 (2)) <br />12 <br />176,208.00 <br />$ <br />0.00450 <br />$ <br />9,515.23 <br />SMCISD ROW 's mow, trim, and <br />litter pickup JAtch1 (2)) <br />6 <br />183,696.20 <br />$ <br />0.00390 <br />$ <br />4,298.49 <br />City Wide Alleys /ROW s -- mow, <br />trim, and litter pickup <br />5 <br />6,675,615.00 <br />$ <br />0.00390 <br />$ <br />130,174.49 <br />Craddock Medians -- mow, trim, <br />and litter pickup <br />10 <br />104,999.50 <br />$ <br />0.00450 <br />$ <br />4,724.98 <br />City Property behind Sam's Club <br />mow <br />4 <br />36.60 <br />$ <br />15.00 <br />$ <br />2,196.00 <br />City Wide drainage / easement <br />mow, trim, and litter pickup <br />4 <br />4,314,556.00 <br />$ <br />0.01683 <br />$ <br />290,455.91 <br />City Wide %lowerbeds (billed by the <br />man -hour) <br />$ <br />15.50 <br />$ <br />13,775.00 <br />Athletic Fields mow and trim <br />66 <br />963,810.00 <br />$ <br />0.000525 <br />$ <br />33,396.00 <br />Downtown Sweeping (billed by the <br />man -hour) <br />$ <br />15.50 <br />$ <br />20,150.00 <br />Litter pickup @ Rio Vista Dam <br />(billed by the man -hour) <br />$ <br />21.00 <br />$ <br />14,250.00 <br />S.M. Roadway area litter pickup <br />(acre) (Atch 1 (2)) <br />12 <br />71.78 <br />$ <br />12.00 <br />$ <br />10,336.32 <br />McCarty Lane — mow, trim, and <br />litter pickup, flowerbed (Atch 1 (2)) <br />6 <br />430,000.00 <br />$ <br />0.00360 <br />$ <br />9,288.00 <br />Wonder World -- mow, trim, and <br />litter pickup (Atch 1 (2)) <br />2 <br />1,610,400.00 <br />$ <br />0.00360 <br />$ <br />11,594.88 <br />IH35 — mow, trim inside city limits <br />3 <br />11,325,600.00 <br />$ <br />0.000414 <br />$ <br />14.066.40 <br />IH35 litter pickup -- inside city limits <br />10 <br />11,325,600.00 <br />$ <br />0.000238 <br />$ <br />26,954.93 <br />IH 35 Intersections — mow, trim, <br />and litter pickup (Atch1 (2)) <br />2 <br />1,502,000.00 <br />$ <br />0.00263 <br />$ <br />7,900.00 <br />I $ <br />603,076.63 <br />a <br />H <br />H <br />0 <br />3 <br />t� <br />z <br />H <br />r, <br />