My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2011-139
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2011
>
Res 2011-139
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2011 4:38:45 PM
Creation date
11/28/2011 2:16:03 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2011-139
Date
11/15/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PROFESSIONAL ENGINEERING SERVICES AGREEMENT <br />This Agreement is effective 1 1 / 7 5/ 1 1 between the City of San Marcos, Texas, a <br />home -rule municipal corporation, (the "City "), 630 East Hopkins, San Marcos, Texas 78666 and <br />K. Friese and Associates, Inc. (the "Engineer "), 1120 S. Capital of Texas, The Setting Il, Suite <br />100, Austin, Texas 78746, for the Engineer's provision of engineering services in connection <br />with the Sessom Creek Wastewater Capacity Improvements (the "Project "). <br />The City and the Engineer agree as follows: <br />ARTICLE 1 <br />ENGINEER'S SERVICES AND STANDARD OF PERFORMANCE <br />A. The term of this Agreement begins on the effective date established above and will end <br />upon the Engineer's completion, and the City's acceptance of all services included in this <br />Agreement. The Engineer agrees to provide the City with the services described in Attachment <br />A, Scope of Services, which is incorporated herein by reference for all intents and purposes, and <br />which services may be more generally described as follows: This project includes three separate <br />construction contracts. One will include a wastewater alignment through the Texas State <br />University Campus, one will install a new line downstream of the Texas State University <br />Campus, and the third set will be incorporated into the N. LBJ Drive reconstruction project. All <br />necessary services to develop two complete sets of construction documents and one set of <br />construction plans, all with separate bid and construction schedules, are included in this <br />agreement. <br />B. The Engineer understands that time is of the essence and agrees to provide all design <br />work and professional services in the most expedient and efficient manner possible in order to <br />complete the Project by: 38 weeks in accordance with the approved Project schedule included in <br />this Agreement as Attachment B. <br />C. The Engineer will not subcontract any work under this Agreement without prior written <br />approval from the City. In the event approval is given by the City, the Engineer will specify the <br />appropriate insurance requirements and miscellaneous provisions by separate written agreement <br />with the subcontractor. <br />D. The Engineer will perform all of its services in coordination with the City. The Engineer <br />will advise the City of data and information the Engineer needs to perform its services and the <br />Engineer will meet with City representatives at mutually convenient times to assemble this data <br />and information. <br />E. Tom Owens, P.E. is the Engineer's Project Representative assigned to this Project. The <br />Engineer will not substitute another representative for this Project unless approved in writing by <br />the City in advance of such proposed substitution. In the event the City and the Engineer cannot <br />agree to the substitution of the Project Representative, the City may terminate this agreement. <br />
The URL can be used to link to this page
Your browser does not support the video tag.