Laserfiche WebLink
Task <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />16 <br />Attachment C <br />Table 1.0 City of San Marcos SSES - Basin 10 Fee Unit and Total Costs <br />Description of Services Unit Estimated <br />I I Quantity' <br />Mobilization <br />Above Ground Physical Inspection <br />Below Ground Physical Inspection <br />Smoke Testing <br />Dyed Water Flooding /Leak Quanitification <br />Flow Isolation <br />Sanitary Sewer Main Cleaning <br />Sanitary Sewer Main Internal Television Inspection <br />Public Relations <br />Project Management and Administration <br />JMonthly Project Meetings <br />Engineering Data Analysis, Rocommended Rehabilitation Summaries <br />and Cost Estimates <br />Draft Report <br />Final Report <br />Clean Out Verification <br />Totals <br />Lump Sum <br />LF <br />Per Each <br />LF <br />Per Each <br />Per Each <br />Per LF <br />Per LF <br />Lump Sum <br />Lump Sum <br />Per Each <br />Unit Cost <br />f$) <br />1 <br />$ <br />4,000.00 <br />141,963 <br />$ <br />0.13 <br />414 <br />$ <br />122.85 <br />141,963 <br />$ <br />0.43 <br />10 <br />$ <br />447.30 <br />10 <br />$ <br />447.30 <br />7,098 <br />$ <br />4.00 <br />7,098 <br />$ <br />3.00 <br />1 <br />$ <br />7,837.20 <br />1 <br />$ <br />21,993.30 <br />6 <br />$ <br />2,265.90 <br />Task <br />Cost <br />4,000.00 <br />17,887.34 <br />50,859.90 <br />61,115.07 <br />4,473.00 <br />4,473.00 <br />28,392.60 <br />21,294.45 <br />7,837.20 <br />21,993.30 <br />13,595.40 <br />Lump Sum <br />1 I $ <br />16,090.20 $ <br />16,090.20 <br />Lump Sum <br />1 $ <br />9,111.90 $ <br />9,111.90 <br />Lump Sum <br />1 $ <br />7,114.80 $ <br />7,114.80 <br />Per Each <br />2,000 $ <br />6.83 $ <br />13,650.00 <br />$281,888.16 <br />