My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2000-192
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2000
>
Res 2000-192
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2006 1:30:30 PM
Creation date
7/24/2006 1:30:22 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2000-192
Date
10/9/2000
Volume Book
142
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />WESTOVER IMPROVEMENTS <br />ENGUNEERINGSERVICES <br />AMENDMENT 1 <br /> <br />DETENTION FACILITIES <br /> <br />A. TOPO AND BOUNDARY SURVEY FOR DETENTION $8,410.00 <br />1. Topographic and boundary survey for two (2) ponds, one located on the north side of <br />Girard Street at Earle Street on land currently owned by the San Marcos lSD, and <br />one pond located on the eastern comer of Earle S1. and Bishop S1. (Block 22, Lots <br />322 thru 325) <br /> <br />B. ANALYSIS $12,410.00 <br />1. Hydrology and Preliminary Hydraulics <br />a) Review available information on existing aerial topography, zoning <br />records, etc. <br />b) Perform site visit <br />c) Prepare base map compiling available information <br />2. Final Hydraulics <br />a) Model Pre-development vs. Post-development hydraulics using <br />"Existing" condition depicted in the aerial topo dated 1986 and <br />"Developed" condition based on build-out per current zoning maps, <br />for 1O-year storm <br />b) Analyze downstream conveyance hydraulics for 10-year storm <br />3. Prepare Final Report <br /> <br />C. FINAL DESIGN $2,820.00 <br />1. Prepare plans and specifications for inclusion in the Westover Improvements plans, <br />including the following: <br />a) Site Layout for two (2) ponds <br />b) Site Grading Plan( s) for two (2) ponds <br />c) Incorporate Erosion Control into plans for Street & Drainage <br />Improvements <br />d) Incorporate any revisions to storm sewer design resulting from <br />detention design <br />e) Provide detail sheets for Detention Design <br /> <br />C. CONSTRUCTION SERVICES $2,240.00 <br />1. Perform Construction Services detailed in original scope, as related to the detention <br />design <br /> <br />Additional Services: <br />1) Easement Preparation <br />2) Property Acquisition <br />3) Attend Public Hearings <br />4) Provide Expert Testimony <br />5) Provide Construction Administration beyond original contract time <br />
The URL can be used to link to this page
Your browser does not support the video tag.