My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2000-221
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2000
>
Res 2000-221
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2006 3:44:56 PM
Creation date
7/24/2006 3:28:17 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2000-221
Date
11/13/2000
Volume Book
142
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />as will not cause delay of the Project. <br /> <br />1.5.17 Prepare minor changes in the plans and specifications as directed by the City; and <br />prepare necessary change orders in triplicate originals for approval by the City and <br />execution in accordance with the construction contract documents. Consultant will not <br />issue change orders not previously approved in writing by City, and no course of conduct <br />on the part of Consultant or City will amend, waive or alter this provision. <br /> <br />1.5.18 Conduct professional inspections to determine the dates of substantial completion <br />and final completion for the Project, to evaluate the work for acceptable conformance with <br />the construction contract documents and in light of any subsequent tests performed as <br />described in Subsection 1.5.14 to verify that any minor deviations from the construction <br />contract documents as described in Subsection 1.5.14 have been corrected and that the <br />reasons for any specific qualifications in any and all previous certificates for payment as <br />described in Subsection 1.5.14 hereof are either no longer valid or the condition(s) and/or <br />problem(s) have been corrected; shall receive and review written warranties and related <br />documents required by the construction contract documents and assembled by the <br />Contractor; will issue final certificates for payment or take other appropriate action; and will <br />make a written recommendation to the City regarding City's acceptance of the Project. <br /> <br />1.5.19 Require the submission by the Contractor, and subcontractors performing work on <br />the Project site, of periodic wage rate payment reports and, with the City's assistance, <br />verify compliance with federal and state wage rate requirements for the Project; and notice <br />the City of any noncompliance, or of the failure by the Contractor or subcontractor's to <br />make submissions. <br /> <br />1.5.20 Prepare, or cause to be prepared, and submit to the City a set of reproducible <br />record drawings showing significant changes in the work made during the construction <br />phase. <br /> <br />1.5.21 Ensure that all notices and signs required and provided by the City are posted in <br />the appropriate locations at the Project site. <br /> <br />1.5.22 Conduct final inspection with the City and prepare a punch list prior to final <br />acceptance by the City. <br /> <br />1.5.23 Prior to the end of the one year warranty period, review the completed Project with <br />the City and the Contractor and have all deficient items corrected. The extent ofthe duties, <br />responsibilities and limitations of authority of the Consultant as the City's representative <br />during construction will not be modified or extended after the construction contract <br />documents have been authorized by the City to be competitively bid without written consent <br />of the City and the Consultant and with notice to the Contractor. <br /> <br />1.6 ADDITIONAL SERVICES <br /> <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.