Laserfiche WebLink
<br />. I, . <br /> <br />CSJ #3379-01-008 <br />District # 14 Austin <br />Code Chart 64 #37950 <br />Project: FM 3407 at UPRR in San Marcos <br /> <br />Ilily Adjustments/Relocations <br /> <br />If the proposed construction requires the adjustment, removal or relocation of utility facilities, the <br />State shall establish the necessary utility work and notify the appropriate utility company to design <br />and schedule their adjustments. The Local Entity shall be responsible for all costs associated with <br />the adjustment not assumed by the utility Company. Removal or relocation of such utility facilities <br />shall be in accordance with applicable State law, regulations, policies and procedures. <br /> <br />Construction Responsibilities <br /> <br />The State shall add the project as a change order to a previously awarded contract under TxDOT <br />identifier CSJ 3379-01-008. Construction of the project shall be in accordance with applicable <br />TxDOT specifications, procedures and laws. <br /> <br />The State shall supervise and inspect all work performed by the contractor and provide the <br />necessary engineering, inspection and testing services required to ensure that the construction of the <br />Project is accomplished in accordance with the approved P.S. & E. <br /> <br />I <br /> <br />I <br /> <br />AFA-LPAFA_ VolProj <br /> <br />Page 6 of 6 <br /> <br />Revised 2/3/06 <br />