Laserfiche WebLink
<br />. , <br /> <br />CSJ #0914-33-033 <br />District # 14 - Austin <br />Code Chart 64 #37950 <br />North LBJ Drive in San Marcos <br /> <br />I Environmental Assessment and Mitigation will be carried out as stated in the Master Agreement, <br />without exception. The Local Government shall be responsible for identification of all <br />environmental issues associated with this project and shall be responsible for preparation of the <br />appropriate documentation necessary to secure environmental clearance for the Project. <br />Preparation and coordination of the environmental documentation shall be through the TxDOT <br />Austin District Environmental Coordinator at (512) 832-7168. <br /> <br />8. Compliance with Texas Accessibility Standards and ADA will be as stated in the Master <br />Agreement, without exception. <br /> <br />9. Architectural and Engineering Services will be provided by the Local Government, as stated in the <br />Master Agreement, without exception. The Local Government is responsible for performance of <br />any required architectural or preliminary engineering work. The State may review and comment <br />on the work as required to accomplish the public purposes of the Local Government. The State <br />will cooperate fully with the Local Government in accomplishing these local public purposes to the <br />degree permitted by State and Federal law. <br /> <br />10. Construction Responsibilities will be carried out by the Local Government, as stated in the Master <br />Agreement, without exception. <br /> <br />11. Project Maintenance will be undertaken as provided for in the Master Agreement, without <br />exception. <br /> <br />12. Local Project Sources and Uses of Funds <br />I a. Project Cost Estimate: A Project Cost Estimate is provided in Attachment C. Any work done <br />prior to federal authorization will not be eligible for reimbursement. It is the Local <br />Government's responsibility to verify with the State that the Federal Letter of Authority has <br />been issued for the work covered by this Agreement. <br />b. A Source of Funds estimate is also provided in Attachment C. Attachment C shows the <br />percentage and absolute dollar amount to be contributed to the project by federal, state, and <br />local sources. <br />c. The Local Government is responsible for all non-federal and non-state funding, including all <br />project cost overruns, unless otherwise provided for in this Agreement or through amendment <br />of this agreement. <br />d. Prior to the performance of any engineering review work by the State, the Local Government <br />will pay to the State the amount specified in Attachment C. At a minimum, this amount shall <br />equal the Local Government's funding share for the estimated cost of preliminary engineering <br />for the project. At least sixty (60) days prior to the date set for receipt of the construction bids, <br />the Local Government shall remit its remaining financial share for the State's estimated <br />construction oversight and construction costs. <br />e. In the event that the State determines that additional funding by the Local Government is <br />required at any time during the Project, the State will notify the Local Government in writing. <br />The Local Government shall make payment to the State within thirty (30) days from receipt of <br />the State's written notification. <br />f. Whenever funds are paid by the Local Government to the State under this Agreement, the <br />I Local Government shall remit a check or warrant made payable to the "Texas Department of <br />Transportation Trust Fund." The check or warrant shall be deposited by the State in an <br />escrow account to be managed by the State. Funds in the escrow account may only be <br />applied by the State to the Project. If, after final Project accounting, excess funds remain in <br /> <br />Page 2 of 7 <br />