Laserfiche WebLink
<br />I <br /> <br />I <br /> <br />I <br /> <br />Capital Area Planning Council - Work Order <br /> <br />I';' <br /> <br />.--sANBfRN-- <br /> <br />j'^--j <br /> <br />Accuracy Specifications <br /> <br />The accuracy specifications for the project will be as follows: <br />. ASPRS Class 1 Accuracy Standards for Large Scale Maps (100,200 and 400) <br /> <br />Deliverables <br /> <br />. Project Initiation Phase <br /> <br />.;. Project Work Plan (prelimmary and final) <br /> <br />. Aerial Photography Phase <br /> <br />.:. Flight line plan and control d.1agram <br /> <br />. AGPS/lMU data <br /> <br />... Post processed d.1gttal unagery <br /> <br />. Survey Control Phase <br /> <br />.:. Control diagram <br /> <br />'.. One hard copy and one d.1gttal (ASCII) fue of the report outlining results of <br />the ground Global Pos1tioning Satellite observations <br /> <br />.:. GPS observations, results, observation logs, and data analys1s and <br />adjustments <br /> <br />. Aerial Triangulation Phase <br /> <br />'.' One copy of FAA T Report <br /> <br />. D1gital Orthophoto Phase <br /> <br />.:. One set of d.1gttal orthophotography in TIFF /TFW format DVD's that are <br />compliant with the Digital Imagtng Acceptance Criteria that is mcluded m <br />the Project Work Plan <br /> <br />.:. One set of compressed digttal orthophotography m MrSID format <br /> <br />. Planimetnc and Elevation Data <br /> <br />.:. Updated or new d.1gital elevation (DEM) or terrain (DTM) models <br /> <br />.,. Digital Arc Info fues of planimetric data <br /> <br />. Data for DTM/DEM in ASCII fue format <br /> <br />~ <br /> <br />Acceptance Criteria <br /> <br />The following guidelines establish the Acceptance Criteria between Sanborn and the <br />Participants. The reVlew period 1S subject to an acceptance rating in a unit of delivery <br />(i.e. tile). Sanborn divides the acceptance ctlteria into 3 distmct categories; each of wruch <br />is subject to an acceptance rating that we base on the total number of features e.g., <br />database attributes m a unit of delivery (i.e. tile). The three categor1es of acceptance <br />critetla are, (1) data accuracy, (2) orthophotography accuracy, and (3) reV1ew periods. <br /> <br />1. Data Accuracy: <br /> <br />(a) <br /> <br />Data Base Design: <br /> <br />CAPCOG GeoMap Update: Work Order Fee Schedule - Participants <br />Confidenlial and Proprielary, 0 2005 The Sanborn Map Company, Inc., ALL RIGHTS RESERVED <br /> <br />3 <br />