Laserfiche WebLink
<br />" <br /> <br />I <br />, <br /> <br />BI <br /> <br /> <br />ohBo..d.Co.....itteeP..oject <br />Priority - 5 <br />Sessom Drive Reconstruction <br /> <br />I <br /> <br /> <br /> <br />What does the proiect cover? <br />· Reconstruct of Sessom Dr between Ed JL Green and Academy. <br />· Includes repair of drainage inlets, installation of culverts and guardrails. <br />· Includes bike anclpedestrian improvements through CAMPO grant funds. <br /> <br />Why do we need the proiect? <br />· No reconstruction ofthis street has occurred since its construction in the early 1970's, <br />· Street is experiencing failure around drainage outlets. <br /> <br />is the estimated Ci of San Marcos cost? <br />$775,000 <br />· An additional $775,000 has been awarded to the City of San Marcos by CAMPO in 2005. <br /> <br />· Map represents geographic area of project. <br /> <br />_ Sessoms Dr <br />Reconstruction <br />N <br /> <br /> <br />w.' <br /> <br /> <br />S <br /> <br />city 0' San Marcos <br />Department 0' Environment <br />.nd Engineering <br /> <br />By Caleb <br />Kraenzel <br /> <br />February 2005, <br />