Laserfiche WebLink
<br />I <br /> <br />I <br /> <br />I <br /> <br /> <br />Fee Schedule G-2005rev1 <br /> <br />FEES FOR GEOTECHNICAL ENGINEERING SERVICES <br /> <br />1. <br /> <br />Field Investigation <br />1.1. Mobilization and demobilization, per mobilization <br />1.1.1 Drill truck, water truck, pickup, and crew...................................... $ <br />1.1.2 All-terrain drill rig, pickup, and crew.............................................. $ <br />1.2. All-terrain vehicle with drill rig (additional charge) ....................................... $ <br />1.3. Drilling and sampling <br />1.3.1 Drilling and sampling with 3-inch, thin-walled tube <br />sampler, continuous to 10.0 ft, 5.0-ft intervals thereafter .............. $ 15.50/foot <br />1.3.2 Continuous drilling and sampling with 3-inch, thin-wailed <br />tube sampler or split-spoon sampler for environmental <br /> <br />screening........ ............... ...................., ......... ................... .............. $ <br /> <br />Standard penetration tests............. ............................................................ $ <br />TxDOT cone penetration tests........ ............. ........ ................... .................... $ <br />Rock coring, NX or similar core barrel <br />1.6.1 Drilling in soft rock (Austin Chalk, Eagle Ford Shale, etc.) ............ $ 19.50/foot <br />1.6.2 Drilling in hard rock or cavitated rock (Edwards, Buda, <br />Glen Rose, Georgetown, and Walnut Formations) .......................$ 23.40/foot <br />'I 7. Wash or auger borinos drilled and logged from cuttings: <br /> <br />1 .7.1 Soil ............................................................................................... $ <br /> <br />1 .7.2 Rock............................... ......... ..................................................... $ <br /> <br />1.8. Casing of borehOles ................................................................................... $ <br />1.9. Hourly charges for boring layout, excessive time spent <br />gaining access to boring locations, backfilling boreholes, <br />cleaning up site, installing piezometers, and for other <br />reasons beyond our control..................................... ............ .............. ......... $ 135.00/hour <br />1.10. Rental of concrete core drilling equipment or equipment <br />to gain site access, or traffic control devices ................................................ Cost + 15% <br />1.11. Materials for piezometers, grouting, etc..................... ............ ....................... Cost + 15% <br />1.12. Surveying or other outside contractors ......................................................... Cost + 15% <br />1.13. Traffic control, per man ..............................................................................$ 40.00/hour <br />1.14. Per diem for out-of-town assignments, per man.. _.... ............. ..................... $ 75.00/night <br />1.15 High-pressure steam cleaner..................................................................... $ 250.00/day <br />1.16 OVA meter ............. ............. ..... ........ ......... ........... ...... _............................... $ 300.00/day <br />1.17 Steel drums for drill cuttings (delivered)......................................................$ 55.00/each <br />1,18 Plugging boreholes with bentonite/concrete slurry......................................$ 6.00/foot <br />1 19 Cone penetrometer testmq $ 2,750 OO/08V <br /> <br />3.50/mile <br />4.00/mile <br />320.00/day <br /> <br />1.4. <br />1.5. <br />1.6. <br /> <br />28.00/foot <br />18.00/each <br />23.00/each <br /> <br />10.00/foot <br />16.00/foot <br />10.00/foot <br /> <br />2. <br /> <br />Laboratory Tests <br />2.1. Natural water content and soil classification ...............................................$ <br />2.2. Plastic and liquid limits ...............................................................................$ <br /> <br />1 a.aO/each <br />45.0D/sach <br /> <br />,-\ 'r <br /> <br />-~ <br />