My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2011-155
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2011
>
Res 2011-155
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2012 4:21:10 PM
Creation date
12/27/2011 3:03:55 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2011-155
Date
12/14/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
C <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Freese and Nichols, Inc. <br />Subconsultants and Expenses <br />Computer Expenses <br />Preliminary Inves ation and Analysis Pha <br />5 days) <br />Project Initiation and Project Manual Prep. <br />Project Kick -Off Meeting Internal & External <br />PER TM Meeting <br />Data Collection <br />Hydraulic Modeling <br />Exhibit Preparation <br />Preliminary Engineering Report <br />OPCC <br />QC <br />Prepare Submittal <br />i n Phase (60 days) <br />Design Workshop <br />Design P &P's & Details <br />Specifications <br />Utility Coordination <br />OPCC <br />QC <br />Prepare Submittal <br />10% Design Phase (45 days) <br />Design Workshop <br />Design P &P's & Details <br />Specifications <br />Utility Coordination <br />OPCC <br />QC <br />Project Management <br />Prepare Submittal <br />Address 90% Comments and create bid sets <br />lid Phase (60 days max) <br />Prebid Meeting <br />Bid Opening <br />Prepare Addenda (Assumed 3 total) <br />Bid Tabulation <br />Review Contractor Experience <br />Prepare Recommendation of Award <br />Conform Documents and Provide Construction Docs <br />i€a r� phase (370 days) <br />Preconstruction Meeting <br />Construction Site Visits /Progress Meetings (Max. 3) <br />Punchlist Meeting (Max. 2) <br />Review Submittals (Assumed 10 max.) <br />Review RFI's (Assume 3 max.) <br />Create and Review PCM's (2 max.) <br />Prepare Record Drawings <br />Project Closeout <br />Total Basic Services Subconsultants and Exile <br />3 of 3 <br />City of San Marcos, Texas <br />North Street, Nance Street, Moore Street and Mary Street Wastewater Improvements <br />Attachment C -1 - Estimated Fee Summary <br />Computer Hrs TB&W copies I Color copies Miles Plotter -color Plotter - other Binding I Survey Sub Sub 2 <br />200 <br />130 <br />8 <br />200 <br />4 <br />130 <br />6 <br />221 <br />8 <br />50 <br />30 <br />241 <br />50 <br />18 <br />$ <br />20 <br />20 <br />100 <br />420 <br />500 <br />6 <br />820 <br />20 <br />6 <br />$ <br />50 <br />8 <br />50 <br />$ <br />6 <br />20 <br />120 <br />-- —50 <br />200 <br />2 <br />'100 <br />500 <br />8 <br />20 <br />_ 8 <br />100 <br />20 <br />12 <br />600 <br />10 <br />600 <br />70.00 <br />$ <br />119.88 <br />$ <br />16 <br />50 <br />20 <br />80 <br />100 <br />200 <br />20 <br />500 <br />12 <br />20 <br />6 <br />100 <br />20 <br />12 <br />600 <br />6 <br />600 <br />8 <br />50 <br />12 <br />2,035 <br />62.00 <br />50 <br />$ <br />8 <br />50 <br />6 <br />100 <br />20 <br />20 <br />50 <br />4 <br />20 <br />2 <br />100 <br />20 <br />2 <br />100 <br />10 <br />41 <br />2,000 <br />205.00 <br />$ <br />42.00 <br />$ <br />8 <br />50 <br />8 <br />100 <br />8 <br />20 <br />8 <br />100 <br />200 <br />8 <br />150 <br />50 <br />8 <br />120 <br />50 <br />8 <br />50 <br />8 <br />50 <br />200 <br />130 <br />$ <br />305 <br />100 <br />130 <br />$ <br />221 <br />100 <br />$ <br />241 <br />20 <br />50 <br />$ <br />20 <br />m <br />m <br />20 <br />50 <br />�Ci■i7 <br />65 <br />130 <br />65 <br />130 <br />130 <br />65 <br />130 <br />390 <br />130 <br />IE <br />in <br />50 <br />20 <br />50 <br />3 <br />3 <br />1 <br />26110 <br />LAResources \Contract Blue Sheets \S \San_Marcos \WW_Improvements \November 21 Final\Attachment C -1 - Fee Summary - 11 -21 -11 <br />Total Basic $ 133,082 <br />Project Fee Summary Total Special $ - <br />Total Project $ 133,082 <br />Total Subs / <br />Misc. Expenses <br />Q _ <br />100 <br />$ <br />305 <br />100 <br />$ <br />221 <br />100 <br />$ <br />241 <br />$ <br />85 <br />$ <br />420 <br />500 <br />$ <br />820 <br />$ <br />27,651 <br />$ <br />62 <br />-- —50 <br />$ <br />171 <br />'100 <br />$ <br />310 <br />100 <br />$ <br />253 <br />$ <br />1,245 <br />$ <br />70.00 <br />$ <br />119.88 <br />$ <br />82.00 <br />50 <br />$ <br />249.75 <br />100 <br />$ <br />320.13 <br />100 <br />$ <br />352.76 <br />$ <br />1,132.50 <br />$ <br />250.00 <br />$ <br />122.00 <br />$ <br />62.00 <br />50 <br />$ <br />249.75 <br />$ <br />137.25 <br />100 <br />$ <br />190.00 <br />$ <br />671.88 <br />100 <br />$ <br />265.76 <br />100 <br />$ <br />242.76 <br />$ <br />205.00 <br />$ <br />42.00 <br />$ <br />22.00 <br />$ <br />21.00 <br />$ <br />398.63 <br />100 <br />$ <br />265.76 <br />150 <br />$ <br />474.77 <br />120 <br />$ <br />283.76 <br />$ <br />100.00 <br />$ <br />85.00 <br />$ <br />85.00 <br />100 <br />$1 <br />477.50 <br />$ <br />85.00 <br />$ 2,226 <br />$ <br />38,847 <br />11121/2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.