My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2004-214
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2004
>
Res 2004-214
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2006 9:56:28 AM
Creation date
7/26/2006 9:50:57 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2004-214
Date
12/6/2004
Volume Book
159
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />RFP 24-057 <br /> <br />I 3.02 <br /> <br />3.03 <br /> <br />I <br /> <br />587 -0702 <br /> <br />INSTALLATION OF DUCTWORK <br /> <br />A. General: Assemble and install ductwork in accordance with recognized industry <br />practices which will achieve air-tight and noiseless (no objectionable noise) systems, <br />capable of performing each indicated service. Install each run with minimum <br />number of joints. Align ductwork accurately at connections, within 1/8-inch <br />misalignment tolerance and with internal surfaces smooth. Support ducts rigidly with <br />suitable ties, braces, hangers, and anchors of type which will hold ducts true-to- <br />shape and to prevent buckling. Support vertical ducts at every floor or as <br />recommended by manufacturer. <br /> <br />B. Field Fabrication: Complete fabrication of work at project as necessary to match <br />shop-fabricated work and accommodate installation requirements. <br /> <br />C. Routing: Locate ductwork runs as indicated in the plans. <br /> <br />D. Coordination: Coordinate duct installations with installation of accessories, <br />dampers, equipment, controls, weir area covers, and other associated work of <br />ductwork system. <br /> <br />FIELD QUALITY CONTROL <br /> <br />Any ductwork found to be improperly installed will be removed and replaced with ductwork, <br />liner or fittings meeting these specifications. Improper installation will include, but not be <br />limited to, the following: <br /> <br />A. Fiberglass duct smaller than specified. <br /> <br />B. Construction joints not properly sealed. <br /> <br />3.04 EQUIPMENT CONNECTIONS <br /> <br />General: Connect ductwork to equipment as indicated, provide flexible connection for <br />each ductwork connection to equipment mounted on vibration isolators, and/or equipment <br />containing rotating machinery. Provide access doors as indicated. <br /> <br />3.05 ADJUSTING AND CLEANING <br /> <br />I <br /> <br />A. Clean ductwork internally, unit by unit as it is installed, of dust and debris. Clean <br />external surfaces of foreign substances which might cause corrosive deterioration of <br />fiberglass or, where ductwork is to be painted, might interfere with painting or cause <br />paint deterioration. <br /> <br />B. <br /> <br />Temporary Closure: At ends of ducts which are not connected to equipment or air <br />distribution devices at time of ductwork installation, provide temporary closure of <br />polyethylene film or other covering which will prevent entrance of dust and debris <br />until time connections are to be completed. <br /> <br />15892-8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.