Laserfiche WebLink
<br />Attachment C <br /> <br />Project Title: STEP - Wave <br />Subgrantee: City of San Marcos <br /> <br /> <br /> <br />Post-surveys <br /> <br />BUCLKE UP IN YOUR TRUCK(BUYT/CLICK IT OR TICKET (ClOT - Thanks <br /> <br /> <br />Labor Day (Required If Added) <br /> <br />Description of Activities <br /> <br />I <br /> <br />Pre-Surveys <br />Prior to conducting any wave enforcement activity, conduct pre-observational surveys to establish safety <br />belt usage rates and speed limit compliance. <br /> <br />Media Campaign <br /> <br />Conduct local media events immediately before the enforcement effort to maximize the visibility of <br />enforcement to the public. These media events tell the public when, where, how and why the safety belt <br />and speed limit laws are being enforced. Media will emphasize the special target groups of each wave <br />effort, i.e. Child Passenger Safety Week, Buckle Up America Week, ClOT, etc. <br /> <br />Enforcement Blitz <br />Intensify enforcement through an overtime STEP that places primary emphasis on increasing the number <br />of citations for non-use of occupant restraints, and/or speeding, during the peak holiday traffic. <br /> <br />Traffic Safety Project Description <br /> <br />Page 60f7 <br /> <br />TxDOT Form 2076-sw (Rev. 9/23/2004) <br />