Laserfiche WebLink
<br />I <br /> <br />I <br /> <br />I <br /> <br />1.4.23 Prior to the end of the one year warranty period, review the completed Project wIth the <br />City and the Contractor and have all deficient items corrected. The extent of the duties, <br />responsibilities and limItations of authority of the Engineer as the City's representative dUrIng <br />construction will not be modified or extended after the construction contract documents have <br />been authorized by the City to be competitively bid without wntten consent of the CIty and the <br />Engineer and with notice to the Contractor. <br /> <br />1.5 ADDITIONAL SERVICES <br /> <br />1.5.1 Since the Engineer's compensation is a fixed fee for Basic Services, mcludll1g mll10r <br />deviations from those described in this Agreement, compensatiOn to the Engineer for addItIOnal <br />services wIll only be for substantial devIations from the scope of servIces descnbed 111 this <br />Agreement. The Consultant will submit a written estimate of fees to the City and obtall1 the <br />CIty's authorization before initiating any additiOnal services <br /> <br />1.5.2 Each material change (deletion or addition) in the services to be provided by Engineer <br />must be authorized by the City on the Authorization of Change in Services form attached to this <br />Agreement as Attachment A. Compensation for addItional services will be 111 addItion to that <br />specIfied for Basic Services m accordance with Section 14 of this Agreement. The approval of <br />the City's governing body is necessary for all addItIOnal servIces the compensatiOn for whIch <br />exceeds $25,000. <br /> <br />ARTICLE 2 <br />THE CITY'S RESPONSIBILITIES <br /> <br />The CIty will: <br /> <br />2.1 Provide full information to the Engineer regarding the City's reqUIrements for the <br />Engineer's services under this Agreement. The City will furnish the Engineer with copies of <br />official City deSIgn standards and construction standards, and other data and mf0n11atIon 111 the <br />City's possession needed by the Engineer at the Engineer's request. <br /> <br />2.2 Designate JIm Klein as the City's Project Manager and authorized representative to act <br />on the City's behalf with respect to thIs Agreement. The CIty will examll1e the documents and <br />information submitted by the Engineer and promptly render responses to the Engineer on Issues <br />requiring a decision by the City <br /> <br />2.3 Provide access to and make all necessary provisions for the Engll1eer to enter public and <br />private property as reqUIred for the Engineer to perform its services under this Agreement. <br /> <br />2.4 Be responsible for the cost ofprmting and binding of the bid documents. <br /> <br />2.5 Be responsible for any costs assOCIated with a lIcense applIcation to the Ul1lon Pacdic <br />Railroad. <br /> <br />8 <br />