My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2004-153
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2004
>
Res 2004-153
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2006 11:08:01 AM
Creation date
7/28/2006 10:59:51 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
LCRA
Number
2004-153
Date
9/13/2004
Volume Book
157
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />I <br /> <br />46. <br /> <br />Exhibit 4 - Maintenance Requirements <br /> <br />Mobile Substation, Temporary Equipment, and Portable Cables Maintenance Intervals <br /> <br />4.1 Description <br /> <br />4.1.1 Mobile Substations and temporary equipment are vital to the overall <br />operations and maintenance functions of substation facilities. Due to <br />inherent safety risks and wear-and-tear, each unit requires special safety <br />and maintenance criteria. <br /> <br />4.2 Portable Cables: <br /> <br />4.2.1 Micro-Ohm Tests <br />o Measure cable resistance <br />o Measure shield resistance <br /> <br />4.2.2 DC Hi-Pot Tests <br />o Accepted industry test methods: <br />. Test cable per IEEE Std. 400-1991 <br />. Test cable per Doble standard (Recommended) <br /> <br />Energization Test: Tests to be performed prior to energization <br />After verifying that all cables and potheads are in good physical condition, <br />energize cables for a minimum of 60 seconds prior to picking up load on <br />cables. NOTE: All personnel should maintain a safe working <br />distance from cables during this energization test. <br /> <br />4.3 Mobile Substation and Temporary Equipment Maintenance Activity Guidelines <br />(Intervals in months <br /> <br />Mobile Substations and Temporary Equipment <br /> <br />Transformer: <br />DGA + mini CD <br />Insulation/PF Tests <br />Auxiliary Equipment ~ <br /> <br />Interval <br /> <br />12 <br />12 <br />72 <br /> <br />LTC: <br />DGA+mini CD <br />Disassembly + Controls + Auxiliary Equipment Q) <br /> <br />Power Circuit Breakers: <br />Operating Mechanism <br />Disassembly + Controls + Auxiliary Equipment <br /> <br />12 <br />72 <br /> <br />36 <br />72 <br /> <br />Mobile - Memo of Understanding 8/24/2004 <br /> <br />Page 8 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.