My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2004-155
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2004
>
Res 2004-155
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2006 11:08:09 AM
Creation date
7/28/2006 11:01:37 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2004-155
Date
9/13/2004
Volume Book
157
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />I <br /> <br />ARTICLE 3 <br />CONSTRUCTION COST <br /> <br />3.1 <br /> <br />DEFINITION <br /> <br />3.1.1 The construction cost will be the total cost or estimated cost to the CIty of all elements of <br />the Project desIgned or specified by the Engineer. <br /> <br />3 1.2 The construction cost will include at current market rates, including a reasonable <br />allowance for overhead and profit, the cost of any equipment which has been deSIgned, specified, <br />selected or specIally provIded for by the Engineer, except that used materials and equipment will <br />be Included as if purchased new for the ProJect. <br /> <br />3.1.3 Construction cost does not include the compensation of the Engmeer and the Engmeer's <br />consultants, or other costs whIch are the responsibIlIty of the CIty as provided III AI11cle :2 <br /> <br />3.2 RESPONSIBILITY FOR CONSTRUCTION COST <br /> <br />3.2.1 EvaluatIOns of the CIty'S Project budget and detaIled cost estimates, if any, prepared by <br />the Engineer, will represent the Engineer's best Judgment as a design professional familiar WIth <br />the constructIOn Industry. <br />3.2.2 A fixed limit of construction cost for this Project will be establIshed by the CIty'S <br />representative after consulting with the Engineer. The Engineer will be permitted to mclude <br />contingencies for design, bidding and price escalatIOn, to determine what materials, eqll1pment, <br />and types of construction are to be included in the constructIOn contract documents, to make <br />reasonable adjustments in the scope of the Project and to include In the constructIOn contract <br />documents alternate bids to adjust the constructIOn cost to the fixed lImit. The fixed limIt of <br />construction cost may be increased by the City <br /> <br />3.2.3 If the lowest bona fide bid exceeds the Engineer's most recent approved cost estImate <br />established as a condItion of this Agreement, the CIty will (1) give WrItten approval of an <br />increase m such fixed limit, (2) authonze re-bidding of the Project wlthm a reasonable tIme, or <br />(3) cooperate In revising the Project scope and qualIty to reduce the constructlon cost Durlllg <br />the development of the Project through the phases descnbed by Article I of thIS Agreement and <br />pnor to the CIty'S final approval of constructIOn contract documents, the Engllleer \\J1lmonllm <br />the established probable constructIOn cost In relation to the establIshed fixed lImIt. <br /> <br />If necessary, the Engineer will implement constructIon cost saVIngs measures or <br />otherwise endeavor to limit probable construction cost to the level of aVaIlable funds set by the <br />City. <br /> <br />ARTICLE 4 <br />REIMBURSABLE EXPENSES. <br /> <br />4.1 <br /> <br />Reimbursable expenses, including such things as expenses for mileage, printing and plan <br /> <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.