Laserfiche WebLink
<br />1--- <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />SCHEDULE F <br />Installation and Training <br /> <br />1. <br /> <br />Installation <br /> <br />1.1 <br /> <br />On-site installation of all Hardware and Software purchased from The Library Corporation will <br />be performed by technician(s) who will unpack, connect, and test all Hardware purchased from <br />The Library Corporation. <br /> <br />Installation Expenses <br /> <br />$ 3,600 <br /> <br />2. Training <br /> <br />2.1 6 days of on-site staff operator training, training materials, and support in the use of Hardware <br />and Software for a maximum of 10 people per trainer at $1,200 per trainer per day. The City <br />should plan on one terminal for every 3-5 trainees <br /> <br />On-site training will be provided as follows: <br /> <br />PAC Module - 1 hour <br />Circulation Module - 7 hours <br />Cataloging Module - 8 hours <br />Online Selection Assistant - 8 hours <br />System Administration - 4 hours <br />Other training as needed and specified by the library staff - 20 hours <br /> <br />If the City feels more training is needed, additional days can be purchased at $1,200 per day <br /> <br />Training Expenses <br /> <br />$ 7,200 <br /> <br />Total Installation and Training: <br /> <br />$10,800 <br /> <br />September 2, 2004 <br /> <br />Library Contract <br /> <br />Page 19 of 29 <br /> <br />i <br /> <br />~ <br />