My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2006-040
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2006
>
Res 2006-040
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2006 1:46:12 PM
Creation date
8/7/2006 1:45:46 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2006-40
Date
2/21/2006
Volume Book
166
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />this Agreement and the construction contract documents, the more restrictive and/or burdensome <br />with respect to the Engineer's role and responsibility will govern and control. <br /> <br />ARTICLE 14 <br />NOTICES <br /> <br />14.1 Notices required under this Agreement will be provided by the parties to one another by <br />certified mail, return receipt requested, or by confirmed facsimile transmission, to the following <br />addresses: <br /> <br />To the City: <br />City Manager <br />City of San Marcos <br />630 E. Hopkins <br />San Marcos, Texas 78666 <br />Fax: 512-396-4656 <br /> <br />To the Engineer: <br />James E. Bym, President <br />Bym and Associates, Inc. <br />P.O. Box 1433 <br />San Marcos, Texas 78666 <br />Fax: 512-392-2945 <br /> <br />ARTICLE 15 <br />BASIS OF COMPENSATION <br /> <br />15.1 The City will compensate the Engineer, in accordance with Article 5, Payments to the <br />Engineer, and the other terms and conditions of this Agreement, as follows: <br /> <br />15.2 The total of all fees and expenses to be paid to Engineer for Preliminary Design Services <br />as described in Section 1.2 will not exceed $149,955.00. <br /> <br />15.3 Compensation for Basic Services and for Additional Services of the Engineer shall be <br />computed based on the Engineer's standard hourly rates: <br /> <br />Principals: <br />James E. Bym, P.E. <br />David C. Williamson, R.P.L.S <br />Office Personnel: <br />Registered Engineer <br />Graduate Engineer <br />Registered Surveyor <br />Technician I <br />Technician II <br />Technician III <br />Clerical <br />Field Survey Party: <br />Field Crew and Equipment (2 man) <br />Additional Personnel for Crew <br />Field Crew and Equipment (1 man) <br />Reimbursables (when applicable): <br />Stakes <br /> <br />Byrn-Rio Vista Terrace Agreement <br /> <br />$135.00 <br />$110.00 <br /> <br />$120.00 <br />$100.00 <br />$100.00 <br />$ 80.00 <br />$ 70.00 <br />$ 65.00 <br />$ 45.00 <br /> <br />$110.00 <br />$ 30.00/ea <br />$ 80.00 <br /> <br />$0.50/ea <br /> <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.