My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2006-045
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2006
>
Res 2006-045
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2007 9:24:50 AM
Creation date
8/7/2006 2:13:37 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Contract
Number
2006-45
Date
3/7/2006
Volume Book
166
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />C. Construction. The "Construction Costs" for the Delivery Facilities will consist of 1) I <br />construction costs payable to the construction contractor, 2) the costs for inspection services during <br />construction, 3) the costs for right-of-way agent services to coordinate construction activities with <br />landowners, and 4) the cost of professional testing services related to the construction. The City will <br />secure bids for construction ofthe Delivery Facilities using a sealed bid process. The City will notify <br />TXI ofthe contractor to which the City intends to award the construction contract, the amount ofthe <br />proposed bid award, and whether the bid award will include oversizing as described in Section 2.02 <br />above. The notice will include a copy of the tabulation of bids (including alternate bids), and an <br />estimate ofthe cost of inspection, landowner coordination and testing services. TXI agrees to pay to <br />the City, within 30 days of the date of this notice, the amount of the proposed bid award (less any <br />amount for oversizing for which the City is responsible under Section 2.02 above) and the estimated <br />cost of inspection, landowner coordination and testing services. The City agrees to use the funds <br />provided by TXI under this paragraph only for the construction, inspection, landowner coordination, <br />and testing services costs. The City will provide a monthly report to TXI of funds expended by the <br />City for Construction Costs. The City will notify TXI of any change orders that result in a change in <br />the Construction Costs, and will provide TXI with an opportunity to review and provide comment <br />regarding such change orders before approval by the City, If TXI requests a change order that <br />increases the Construction Costs, TXI will pay the amount of the increase to the City in a timely <br />manner before the City executes the change order. Upon completion of the Delivery Facilities and <br />final payments by the City, the City will provide a summary ofthe Construction Costs to TXL The <br />summary will be accompanied by a refund if the final amount of costs for which TXI is responsible I <br />is less than the sum of amounts previously paid by TXI to the City, or by an itemized invoice if the <br />final amount of costs for which TXI is responsible is more than the sum of amounts previously paid <br />by TXI to the City. TXI will pay to the City the amount of any such invoice within 30 days of the <br />invoice date. <br /> <br />D. Estimate of Engineering, Easement, and Construction Costs; Failure to Complete <br />Delivery Facilities. Prior to receiving any funds from TXI, the City shall provide TXI an estimate in <br />writing of the total Engineering Fees, Easement Costs and Construction Costs (the "Total Cost <br />Estimate"). TXI shall be permitted, in its sole and exclusive discretion to terminate this Contract <br />without liability if it does not approve of the Total Cost Estimate, before giving the City written <br />authorization to proceed. After such written authorization by TXI, the City shall use its best efforts <br />to keep the total amount of such expenses equal to or less than the Total Cost Estimate. In the event <br />that actual total amount of such expenses is more than 50% greater than the Total Cost Estimate, <br />such amount exceeding 50% over the Total Cost Estimate shall be paid by the City and shall not be <br />reimbursed by TXI. In the event the City does not have the ability to fund such excess, TXI may at <br />its option pay such excess and offset it against amounts otherwise due to the City under this Contract <br />until the excess has been offset in its entirety. In the event the City fails to complete the Delivery <br />Facilities to the extent required to deliver Reclaimed Water to TXI at the TXI facility, or the City <br />otherwise does not deliver Reclaimed Water to TXI in breach of this Contract, the City will refund <br />to TXI all of the Engineering Fees, the Easement Costs, and the Construction Costs previously paid <br />by TXI. In the event the City delivers a portion of Reclaimed Water required under this Contract but I <br />ceases to deliver water in breach of this Contract, the City will refund a pro-rated amount of the <br />Engineering Fees, Easement Costs, and Construction Costs, based on the amount of water delivered <br />to the total obligation of water delivery under this Contract. <br /> <br />4 <br /> <br />!PJ3PI/O? <br />
The URL can be used to link to this page
Your browser does not support the video tag.