My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1999-022
San-Marcos
>
City Clerk
>
03 Resolutions
>
1990 s
>
1999
>
Res 1999-022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2006 3:51:18 PM
Creation date
8/10/2006 3:50:45 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Amendment
Number
1999-22
Date
1/25/1999
Volume Book
135
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />111 <br /> <br />STATE OF TEXAS <br /> <br />COUNTY OF HAYS <br /> <br />AMENDMENT NO.1 <br />PROFESSIONAL ENGINEERING SERVICES AGREEMENT <br />THE EASTSIDE INTERCEPTOR PHASE II <br />& IH 35 RELIEF SEWER EXTENSION PROJECT <br /> <br />The City of San Marcos ("City") and Turner Collie & Braden, Inc.("Engineer") agree to <br />amend the Agreement for professional engineering services in connection with the <br />Eastside Interceptor Phase II & IH 35 Relief Sewer Extension Project approved by the City <br />on April 27, 1998 (the "Agreement") as follows: <br /> <br />1. Article 1, Consultant's Services and Responsibilities, is amended to add as a <br />general description of the Project the Project Description attached as Attachment 1 to this <br />Amendment and to add as basic services all of the services described in the Scope of <br />Services attached as Attachment 2 to this Amendment. The Engineer will designate a <br />Canstructian Administrator to perform the functions described in the Canstruction Phase <br />af the Scape af Services. The Engineer is authorized to. engage the services af campetent, <br />prafessional surveying and geatechnical engineering firms as subcontractars. <br /> <br />2. Article 2, the City's Responsibilities, is amended to add the fallowing: <br /> <br />2.6 Pravide the Engineerwith record drawings defining existing utilities along the <br />propased pipeline route. <br /> <br />2.7 Pravide the Engineer with record informatian defining existing City <br />easements along the proposed pipeline route. <br /> <br />3. Section 8.1 of Article 8, T erminatianof Agreement, is; amended to add that the Final <br />Design Phase services provided far in this Amendment No.. 1 will be campleted within 16 <br />weeks from the date of execution af this Amendment, and that the estimated constructian <br />duratian is 12 manths. <br /> <br />4. Article 14, Basis af Compensatian, is amended to. read as fallaws: <br /> <br />Campensatian far Engineer's services identified in this Amendment will be on a <br />reimbursable basis not to exceed $78,390.00 for the Final Design Phase services <br />and a maximum not to exceed amaunt of $43,393 far the Constructian Phase. An <br />itemizatian afthese services is provided in Attachments 3 and 4. Filing, review and <br /> <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.