<br />1.4.17 Prepare minor changes in the plans and specifications as directed by the City; and <br />prepare necessary change orders in triplicate originals for approval by the City and <br />execution in accordance with the construction contract documents. Architect will not issue <br />change orders not previously approved in writing by City, and no course of conduct on the <br />part of Architect or City will amend, waive or alter this provision. <br /> <br />1.4.18 Conduct professional inspections to determine the dates of substantial completion <br />and final completion for the Project, to evaluate the work for acceptable conformance with <br />the construction contract documents and in light of any subsequent tests performed as <br />described in Subsection 1.4.14 to verify that any minor deviations from the construction <br />contract documents as described in Subsection 1.4.14 have been corrected and that the <br />reasons for any specific qualifications in any and all previous certificates for payment as <br />described in Subsection 1.4.14 hereof are either no longer valid or the condition(s) and/or <br />problem(s) have been corrected; shall receive and review written warranties and related <br />documents required by the construction contract documents and assembled by the <br />Contractor; will issue final certificates for payment or take other appropriate action; and will <br />make a written recommendation to the City regarding City's acceptance of the Project. <br /> <br />1.4.19 Require the submission by the Contractor, and subcontractors performing work on <br />the Project site, of periodic wage rate payment reports and, with the City's assistance, <br />verify compliance with federal and state wage rate requirements for the Project; and notice <br />the City of any noncompliance, or of the failure by the Contractor or subcontractor's to <br />make submissions. <br /> <br />1.4.20 Prepare, or cause to be prepared, and submit to the City a set of reproducible <br />record drawings showing significant changes in the work made during the construction <br />phase. <br /> <br />1.4.21 Ensure that all notices and signs required and provided by the City are posted in <br />the appropriate locations at the Project site. <br /> <br />1.4.22 Conduct final inspection with the City and prepare a punch list prior to final <br />acceptance by the City. <br /> <br />1.4.23 Prior to the end of the one year warranty period, review the completed Project with <br />the City and the Contractor and have all deficient items corrected. The extent of the duties, <br />responsibilities and limitations of authority of the Architect as the City's representative <br />during construction will not be modified or extended after the construction contract <br />documents have been authorized by the City to be competitively bid without writteR consent <br />of the City and the Architect and with notice to the Contractor. <br /> <br />1.5 ADDITIONAL SERVICES <br /> <br />1.5.1 Since the Architect's compensation is a fixed fee for Basic Services, including minor <br /> <br />6 <br />