Laserfiche WebLink
<br />EXHIBIT C <br />SCHEDULE OF MATERIALS TESTING COSTS <br />TxDOT CSJ No.:9842SMRCO <br /> <br /> San Marcos Municipal Airport, Phase 4 <br /> TxDOT Detail No.: 9842SMRCO <br /> 12-01-98 <br />ordination & Review <br />Materials Engineer 20 hr @ $ 85.00 Ihr "" $ 1,700.00 <br />p 502 ThIn Bonded O~Artay <br />Beam Flexural Strength (Includes Mix Verification) 124 ea@$ 25.00 lea = $ 3,10.0.00 <br />Cylinder Compressive Strength (Includes Mix VerIfication) 28 ea @ $ 15.00 lea = $ 420.00 <br />Slump 37 ea @ $ 10.00 lea == $ 370.00 <br />Air Content 37 ea @ $ 20.00 lea :: $ 740.00 <br />Temperature 37 Ba @ $ lea = $ <br />Technician Time for Calibration of Mixer and Testing 76 hr @ $ 35.00 Ihr :: $ 2,660.00 <br />Trip Charges 36 ea@$ 93.15 lea = $ 3.353.40 <br />P 501 Full OeptJ1 Concrete RepaIr <br />Beam Flexural Strength 72 ea @ $ 25.00 lea :: $ 1,800.00 <br />Slump 24 sa @ $ 10.00 lea = $ 240.00 <br />Air Content 24 ea @ $ 20.00 lea == $ 480.00 <br />Temperature 24 es @ $ lea = $ <br />Teehician TIme 48 hr @ $ 35.00 Ihr = $ 1,660.00 <br />Trip Charges for Testlng& Monitor Bstchlng 24 ea @ $ 93.15 lea :: $ 2.235.60 <br />P152 & P 208 Aggnlgale Base and Subgrade <br />sture Density Relationship 4 ea @ $ 150.00 lea :; $ 600.00 <br />I .rberg Limits (ASTM 04318) 2 ea @ $ 45.00 lea = $ 90.00 <br />t. _ Ie Analysis 2 ea@S 50.00 lea "" $ 100.00 <br />Nuclear Density 12 ea @ $ 35.00 lea :: $ 420.00 <br />T echician Time (18"0.5) 9 hr @ $ 35.00 Ihr c::I $ 315.00 <br />Trip Charges for Testing 6 ea @ $ 93.15 lea == $ 556.90 <br />4. Direct Tension <br />Concrete Coring 30 es @ $ 25.00 lea =' $ 150.00 <br />Direct Tension Testing 30 e8 @ $ 50.00 lea "" $ 1.500.00 <br />Techician Time (30"1.5) 45 hr @ $ 35.00 Ihr == $ 1.575.00 <br />Trip Charges for Testing 8 ea @ $ 93.15 lea = $ 745.20 <br /> Total "" $ 23,733.10 <br /> <br />C-l <br />