My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1999-042
San-Marcos
>
City Clerk
>
03 Resolutions
>
1990 s
>
1999
>
Res 1999-042
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2006 9:34:20 AM
Creation date
8/14/2006 9:33:59 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Amendment
Number
1999-42
Date
3/1/1999
Volume Book
136
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1.4. The Engineer shall contract with an independent materials and testing laboratory, <br />hereinafter called the "Laboratory" for the purpose of quality control of the work of the <br />Contractor. The services provided shall be in accordance with Exhibit B, "Materials Testing <br />Laboratory Services", attached hereto and made a part of this Supplemental Agreement. <br /> <br />B. Add to Section 5-Payments to the Engineer as follows: <br /> <br />5.1.1.3. The Agent shall pay Engineer for services of the RPR furnished under paragraph A.l. at <br />the rate of $60.00 per hour or any portion thereof. Such payment shall include all direct salary <br />costs, indirect salary costs, fringe benefits, overhead, travel and subsistence, telephone and <br />postage, field office expenses, printing and reproduction costs, any other payroll costs and profit. <br /> <br />5.1.1. 4. If it becomes apparent to the Engineer at any time before services to be rendered under <br />paragraph 5.1.1.3. have been about eighty percent completed that the total amount of <br />compensation to be paid to the Engineer on account of RPR services will exceed $52.300.00 <br />(Amount A), Engineer shall give Agent written notice thereof. Promptly thereafter Agent and <br />Engineer shall review the matter of compensation for RPR services, and either the Agent shall <br />authorize the Engineer to provide additional RPR services, or the Agent and Engineer shall agree <br />to a reduction in the remaining services to be rendered so that the total compensation for such <br />RPR services will not exceed Amount A when such services are completed. <br /> <br />5.1.1.5. Should the total cost of RPR services exceed Amount A, the Engineer shall be <br />compensated for any additional RPR services, authorized by the Agent in excess of Amount A, at <br />an hourly rate agreed upon between the Agent and Engineer. The payment for additional RPR <br />services shall include the costs to the Engineer described in Paragraph 5.1.1.3. <br /> <br />5.1.1. 6. The Agent shall pay Engineer a lump sum fee of $23.750.00 for the services of the <br />Laboratory furnished under paragraph 1.4. at the rates provided in Exhibit C, Schedule of <br />Materials Testing Costs attached hereto and made a part of this Supplemental Agreement. Such <br />payment shall include all costs to the Engineer and Laboratory including direct salary costs, <br />indirect salary costs, fringe benefits, overhead, travel and subsistence, printing and reproduction <br />costs, telephone and postage, materials and equipment and other payroll costs and profits. <br /> <br />C. Amend Attachment G - Disadvantaged Business Enterprise <br /> <br />Amend Project Participation Goal and Good Faith Effort from subcontract -.!L%of the <br />total dollar value of the prime contract to 15 % of the total dollar value of the prime contract. <br /> <br />D. Amend Section 5-Payments to Engineer as follows: <br /> <br />Change Section 5.4.1. to: The maximum amount allowable for payment under the <br /> <br />2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.