My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2006-093
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2006
>
Res 2006-093
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2008 9:01:25 AM
Creation date
8/14/2006 4:10:26 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Grant Application
Number
2006-93
Date
6/6/2006
Volume Book
167
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
requirements including any statutes, rules, regulations, assurances, procedures or any <br />other directives before, during and after the completion of this project. <br />6. The Sponsor shall have on file with the State a current and approved Attorney's <br />Certificate of Airport Property Interests and Exhibit A property map. <br />7. The Sponsor shall have on file with the State, Attachment D, Certification Regarding <br />Drug-Free Workplace Requirements, attached and made a part of this agreement. <br />8. Unless otherwise approved by the State, the Sponsor will not acquire or permit any <br />contractor or subcontractor to acquire any steel or manufactured products produced <br />outside the United States to be used for any project for airport development or noise <br />compatibility for which funds are provided under this grant. The sponsor will include in <br />every contract a provision implementing this special condition. <br />9. Except for instrument landing systems acquired with AIP funds and later donated to and <br />accepted by the FAA, the Sponsor must provide for the continuous operation and <br />maintenance of any navigational aid funded under the AIP during the useful life of the <br />equipment. The sponsor must check the facility, including instrument landing systems, <br />prior to commissioning to ensure it meets the operational standards. The Sponsor must <br />also remove, relocate, or lower each obstruction on the approach or provide for the <br />adequate lighting or marking of the obstruction if any aeronautical study conducted under <br />FAR Part 77 determines that to be acceptable; and mark and light the runway, as <br />appropriate. The Federal Aviation Administration will not take over the ownership, <br />operation, or maintenance of any sponsor-acquired equipment, except for instrument <br />landing systems. <br />10. For a project to replace or reconstruct pavement at the airport, the Sponsor shall <br />implement an effective airport pavement maintenance management program as is <br />required by Airport Sponsor Assurance Number 11. The sponsor shall use such program <br />for the useful life of any pavement constructed, reconstructed, or repaired with Federal <br />financial assistance at the airport. As a minimum, the program must conform to the <br />provisions in Attachment E "Pavement Maintenance Management Program", attached <br />and made a part of this agreement. <br />11. The Sponsor may utilize paving specifications meeting State Highway criteria for <br />runways at non-primary airports with lengths up to 5,000 feet and serving aircraft not <br />exceeding 60,000 pounds gross take-off weight. The sponsor agrees not to request <br />additional AIP funds for reconstruction or rehabilitate of pavement construct utilizing <br />State specification for 10 years from pavement acceptance. <br />Part IV- Nomination of the Agent <br />"1'he Sponsor designates the State as the party to apply for, receive and disburse all funds <br />used, or to be used, in payment of the costs of the project, or in reimbursement to either of <br />the parties for costs incurred. <br />7 of 27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.