My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2012-011
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2012
>
Res 2012-011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2012 10:06:05 AM
Creation date
2/9/2012 1:50:40 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2012-11
Date
2/7/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT "B" <br />Description of Improvements <br />The Project will feature: <br />• Roadway extension will be approximately 2,800 feet in length. <br />+ 80- and 90 -Foot Right of Ways are proposed. <br />• 80 -Foot Roadway section will be constructed as a four lane, undivided road, including 2 -12 <br />foot travel lanes each direction, 14 foot continuous left turn lane, and 4 foot bicycle lanes <br />and 6 foot concrete sidewalks on each side. Total street width is 46 feet face of curb to face <br />of curb. <br />• 90 -Foot Right of Way section approaching to and at the intersection with State Highway <br />(SH) 123. Will be divided roadway with 2 -12 foot travel lanes in each direction, 14 foot left <br />turn lane at the intersection and including a varying width median. <br />• Future development access to be provided. <br />• Preliminary infrastructure for a future traffic signal at the SH 123 intersection to be <br />provided. <br />• Approximately 3,150 feet of 12 inch and 8 inch water lines to be installed (City to pay only <br />for costs needed for oversizing). <br />• Approximately 1,600 feet of 10 inch wastewater to be installed (City to pay only for costs <br />needed for oversizing). <br />• Landscaping of pervious areas included. <br />• State Highway 123 Left Turn Lane improvements to be provided, approximately 750 feet <br />each side of Ratter Road intersection. <br />• Associated paving, drainage, water quality, stormwater detention and striping improvements <br />included. <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.