My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1980-032
San-Marcos
>
City Clerk
>
03 Resolutions
>
1980 s
>
1980
>
Res 1980-032
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2008 10:38:43 AM
Creation date
8/17/2006 11:07:02 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Amendment
Number
1980-32
Date
5/12/1980
Volume Book
52
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />2. Paragraph 3, Compensation to Engineer, as shown in the original <br />agreeemnt, shall be modified as set forth herein. <br /> <br />Delete paragraph 3.a. and add new paragraph 3.a. as follows: <br /> <br />I ~ <br />~ <br /><::s <br /> <br />I <br /> <br /> <br />Step I Preliminary Engineering and Planning: The Engineer <br />shall be compensated a lump sum of One Hundred Seven Thousand, <br />Eighty Eight Dollars ($107,088) for the services described <br />in Section 2.a.(1) through 2.a.(5) above. The Engineer shall <br />in addition be compensated for professional services in con- <br />nection with the Sewer System Evaluation Survey described in <br />item 2.a.(6) above as shown in the following schedule. This <br />schedule is based upon lump sum and unit cost items for esti- <br />mated quantities. If services or quantities other than those <br />described herein are required, they will be considered as <br />"additional services" and the Engineer shall receive additional <br />compensation. The manner of computing the compensation will be <br />determined at the time the Engineer is authorized to proceed <br />with said additional services. <br /> <br />a. <br /> <br />Schedule of Compensation <br /> <br />1. Mobilization (lump sum) <br /> <br />2. Above Ground Physical Inspection <br />353,000 L.F. @ $0.108/L.F. <br /> <br />3. Flow r.1onitoring <br /> <br />a. Install/Remove <br />$545/1ocation x 7 locations <br /> <br />b. Monitoring & Maintenance <br />$385/day x 45 days <br /> <br />4. Groundwater Gauges <br />Installation - 5 locations x $449/1ocation <br /> <br />5. Rain Gauges <br />Installation - 45 days x $30/day <br /> <br />6. Smoke Testing <br />353,000 L.F. x $0.14/L.F. <br /> <br />7. Flow Isolation and Below Ground <br />Physical Inspection <br />$41.20/manhole x 500 manholes <br /> <br />8. Jet Cleaning <br />30,000 L.F. x $O.67/L.F. <br /> <br />9. Internal Inspection <br />30,000 L.F. x $0.85/L.F. <br /> <br />$ 18,346.00 <br /> <br />$ 38,104.00 <br /> <br />$ 3,815.00 <br /> <br />$ 17,325.00 <br /> <br />$ 2,245.00 <br /> <br />$ 1,350.00 <br /> <br />$ 49,420.00 <br /> <br />$ 20,600.00 <br /> <br />$ 20,100.00 <br /> <br />$ 25,800.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.