My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1980-032
San-Marcos
>
City Clerk
>
03 Resolutions
>
1980 s
>
1980
>
Res 1980-032
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2008 10:38:43 AM
Creation date
8/17/2006 11:07:02 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Amendment
Number
1980-32
Date
5/12/1980
Volume Book
52
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />I <br /> <br />? . r ,'ll' (1 rp',J p II l, Cl!-'IIJl (? r~~~LL~!!LJ:.~uJ~l_~Li!l_~(,-.!~, ass hOWIl 1 nth e 0 r 1 ~ i II a 1 <br />(l(jI'C'cellmt, shall be Illodified as set Forth herein. <br /> <br />Delete paragraph 3.a. and add new paragraph 3.a. as follows: <br /> <br />a . ~J~jJ_lJ1 r e lJJ0_Q..Q_t~l~~,JJ_~_PJ;' r i n9 and r 1 c1 !.!.!2- i~HJ : T' 1 (' En gin e e r <br />sha 11 bc cOlllpenSi1 ted a lUlllp S UIIl of One lIulldt'f?rJ Seven Thousand, <br />Eighty Eight Dollars ($107,088) for tile services described <br />in Section 2.il. (1) through 2..a. (5) dbove. The [n~llneer shall <br />in uddition be cOIIIpensated for professioni11 services in con- <br />nection I'Ji th the SevJer System Evaluution Survey described in <br />itelll 2.r1.(6) above as shO\'In in the follovlinr] schedule. This <br />schedule is bused upon lump sum and unit cost itellls for esti- <br />Illilted C]u(]ntities. If services or C]uantities other than those <br />described het'ein are reC]uired, they will be considered i1S <br />"additional services" ilnd the Engineer shall receive (]dditionill <br />compens(] t i on. The row nner of COlllPUt i ng the COlllpensa t i on vii 11 be <br />determined at the tillle the EnCJineer is authorized to proceed <br />with said additional services. <br /> <br />Schedule of Compensation <br /> <br />1. r10bilization (lump sum) <br /> <br />2. Above Ground Physical Inspection <br />353,000 L.F. @ $0.108/L.F. <br /> <br />3. Flow ~onitoring <br /> <br />a. IrJstall/Remove <br />$545/1ocation x 7 locations <br /> <br />b. Monitoring & Maintenance <br />$385/day x 45 days <br /> <br />$ 18,346.00 <br /> <br />$ 37,446.00 <br /> <br />$ 3,815.00 <br /> <br />$ 17,325.00 <br /> <br />4. GroundvJater Gauges <br />Installation - 5 locations x $449/1ocation <br /> <br />5. Rain Gauges <br />Installation - 45 days x $30/day <br /> <br />6. SlllOke Tes t i ng <br />353,000 L.F. x $0.14/L.F. <br /> <br />7. Flow Isolation and 8elow Ground <br />rllysicrll InSI)(1ction <br />51) 1 . 20/llIanho 1 e x 500 man/]? 1 es <br /> <br />n. IJ C' tel e il n i n 9 <br />30,000 L.F. x $O.67/L.F. <br /> <br />9. Internal Inspection <br />30,000 L.F. x $0.85/L.F. <br /> <br />$ 2,245.00 <br /> <br />$ 1,350.00 <br /> <br />',$ 49,420.00 <br /> <br />$ 20,600.00 <br /> <br />$ 20, 100.00 <br /> <br />$ 25,800.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.