My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1980-038
San-Marcos
>
City Clerk
>
03 Resolutions
>
1980 s
>
1980
>
Res 1980-038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2008 10:38:56 AM
Creation date
8/18/2006 11:02:15 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
1980-38
Date
6/16/1980
Volume Book
53
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />I <br /> <br />-6- <br />I <br /> <br />governmental restrictions, laws or regulations or any other causes <br /> <br />similar to those enumerated beyond Engineer's reasonable control. <br /> <br />D. All documents including the estimates, specifications, <br /> <br />field notes and data, will remain the property of Engineer as <br /> <br />instruments of service. The original drawings shall become the <br /> <br />property of the City after the "As Built" drawings of the Project <br /> <br />are complete, however, it is to be understood that the City shall <br /> <br />have free access to all such information with the right to make <br /> <br /> <br />and retain copies of all documents including field 'notes and data. <br /> <br />E. Engineer shall attend neighborhood meetins held ln connection <br /> <br />with Project when requested to do so by City. <br /> <br />ARTICLE III. <br />ADDITIONAL SERVICES <br /> <br />Additional services of Engineer shall consist of all services <br /> <br />not specifically mentioned in Article II. Additional Services include <br /> <br />but are not limited to: <br /> <br />A. <br /> <br />Revisions of drawings and specifications after the <br /> <br />contract for Project is awarded made at City's <br /> <br />request which involves extra services and expenses <br /> <br />to Engineer. <br /> <br />B. Perform field surveys and where necessary site <br /> <br />topography required to collect information needed <br /> <br />in redesign to the Project. <br /> <br />C. Boundary surveys, plat and field notes preparation <br /> <br />for right of way acquisition or easement acquisition. <br /> <br />D. Construction staking establishing construction <br /> <br />stations and reference points typically provided in <br /> <br />similar types of construction work. <br /> <br />E. Check the contractors weekly payroll record for <br /> <br />compliance with wage rate and category provisions <br /> <br />of the contract by comparing payroll records with <br /> <br />specification requirements. <br /> <br />F. Any professional engineering serVlce mutually agreed <br /> <br />upon in writing by the parties which is not expressly <br /> <br />provided for in Article II. <br />
The URL can be used to link to this page
Your browser does not support the video tag.