Laserfiche WebLink
<br />-7- <br /> <br />B. Perform field surveys an9 where necessary site topography <br /> <br />required to collect information needed in design of the <br /> <br />project. <br /> <br />C. Boundary surveys, plat and field notes preparation for <br /> <br />right of way acquisition or easement acquisition. <br /> <br />D. <br /> <br />Construction staking establishing construction stations <br /> <br />I <br /> <br />and reference points typically provided in similar types <br /> <br />of construction work. <br /> <br />E. <br /> <br />Any professional engineering service mutually agreed upon <br /> <br />by the parties which is not expressly provided for in <br /> <br />Article II. <br /> <br />ARTICLE IV. <br />PERIOD OF SERVICE <br /> <br />A. The serVlces called for in the Study and Report Phase <br /> <br />will be completed and the Report submitted within 60 <br /> <br />c~lendar days following the authorization to proceed <br /> <br />with that phase of services. <br /> <br />B. After acceptance by City of the Report, indicating any <br /> <br />specific modifications or changes in scope desired by <br /> <br />I <br /> <br />City, and upon written authorization from City, Engineer <br /> <br />shall proceed with the performance of the services called <br /> <br />for in the Preliminary Design Phase, and shall submit <br /> <br />preliminary design documents and a revised opinion of <br /> <br />probable Improvements Cost within 30 calendar days <br /> <br />following the authorization to proceed with that phase of <br /> <br />services. <br /> <br />C. After acceptance by City of the preliminary design <br /> <br />documents and revised opinion of probable Improvements <br /> <br />Cost, indicating any specific modifications or changes <br /> <br />in scope desired by City, and upon written authorization <br /> <br />from city, Engineer shall proceed with the performance <br /> <br />I <br /> <br />of the services called for in the Final Design Phase, <br /> <br />so as to deliver Contract Documents and a revised opinion <br /> <br />of probable Improvements Cost for all authorized work on <br /> <br />the Improvements within 60 calendar days after the authoriza- <br /> <br />tion to proceed with that phase of services. <br /> <br />D. After acceptance by City of the contract drawings and <br /> <br />Engineer's most recent opinion of probable Improvements <br /> <br />Cost and upon written authorization to proceed, Engineer <br /> <br />shall proceed with performance of the services called for <br />