<br />6 IlIlrrprl'tatiofl ofCofllrC'C( Docllmellts: Transmilto CONTRACTOR ENGINEER's clarifications and interpretalions
<br />of the Contracl Documents,
<br />
<br />7, Modificatiofls: Consiuer and evalullle CONTRACTOR's suggestions for modifications in Drawings or Specifications
<br />Ilnd repon them with recommenuations 10 ENGINEER,
<br />
<br />8, Records,
<br />
<br />a Maintain at the job site orderly files for correspondence, repOrlS of job conferences, Shop Drawings and samples
<br />submissions, reprotluctions of tHlgll1al Contract Documents including all addentla, change orders, lield orders, addl'
<br />tlonal DrawlI1gs issued slIoseqllentto the execlltlon of the Contracl, ENGINEER's clarifications and inlerprelatlOns
<br />of the Contract Documents, progress reports, and other Project related documents
<br />b, Keep a diary or log book, recordll1g hours on the Job Site, weather conditions, data relative to questions of e\tras
<br />or deductions, list of vislllng offiCials and representatives of manufacturers, faoricators, suppliers and dlstnoutors,
<br />daily aClivities, deCisions, observations In general and speCific observallons in more detail as in the case of observing
<br />test procedures. Send copies to ENGINEER
<br />c Record names, addresses and telephone numbers of all CONTRACTORS, subcontractors and major suppliers of
<br />materials and equipment.
<br />
<br />9. ReportJ'
<br />
<br />a Furnish ENGINEER periodic reports as reqUired of progress of the Work and CONTRACTOR's compliance with the
<br />approved progress schedule and schedule of Shop Drawing submiSSions
<br />b, Consull with ENGINEER 111 advance of scheduled major tests, inspections or start of important phases of tbe
<br />work,
<br />c. Report immediately to ENGINEER upon the occurrence of any accident.
<br />
<br />10. Paymeflt RequisitioflJ ReView applicatIOns for payment wllh CONTRACTOR for compliance with the established
<br />procedure for their submiSSion and forward them With recommendatIOns to ENGINEER, nolll1g particularly their
<br />relation 10 the schedule of values, Work completed and matenals and equipment delivered at the site but notmcor-
<br />porated 111 the Work.
<br />
<br />I I. Cerrifi('cJfeJ, Mailltenance al/d Operation M(lnlllll.l Dunng the course of t he Work, venfy that cerlificates, maintenance
<br />and operation manllals and other data reqUired to be assembled and furnIshed by CONTRACTOR are applicable tu
<br />the Items ;Jctually inslalled, and deliver thiS material to ENGINEER for hIS review and forwarding 10 OWNER prior
<br />to final acceptance of the Work.
<br />
<br />12. Completion:
<br />
<br />a. Before ENGINEER issues a Cel11ficate of Substanlial Completion, submit to CONTRACTOR a lisl of observed
<br />Items requiring completion or correction
<br />b Conducl final Inspection In the company of ENGINEER, OWNER and CONTRACTOR and prepare a final list of
<br />items 10 be completed or corrected,
<br />c. Verify that all items on final list have been completed or corrected and mak.e recommendations 10 ENGINEER
<br />concerning acceptance
<br />
<br />C. Llmitalions of Aulhorily.
<br />
<br />Excepl upon written instructIOns of ENGINEER, ReSident Project Representative'
<br />
<br />I. Shall not aUlhonze any deVIation from the Contract Documents or approve any subslitute matenals or equipment.
<br />
<br />2, Shall nol exceed limitations on ENGINEER's authority as sel forth 111 the Contract Documenls,
<br />
<br />J. Shall notundcrtake any of the responsIbilities of CONTRACTOR, subcontractors orCONTRACTOR's supenntendent,
<br />or expedite the Work
<br />
<br />4 Shall not adVise on or Issue directIOns relative 10 any aspect of the means, methods, techniques, sequences or
<br />procedures of construction unless such IS speCifically called for in the Contract Documents
<br />
<br />5, Shall not advise on or issue directions as to safety precautions and programs in connection with the Work
<br />
<br />6 Shall nol authorize OWNER LO occupy the Project in whole or in pan
<br />
<br />7 Shall not participate in specialized field or laboratory tesls