Laserfiche WebLink
Attachment B <br />City of San Marcos <br />Wastewater System Model Development and Calibration to Existing Wastewater System Conditions <br />February 21, 2012 <br />ID <br />__ ___ ______________________ <br />t Protect Kickoff Meeting and Model Software Selection <br />2 -TASK B. FLOW MONITORING AND FLOW DATA ANALYSIS <br />3 Data Collection and Preparatory Work <br />4 - Temporary Flow Meter Installation, Calibration, Data Collection <br />5 Flow Data Analysis and Evaluation <br />6 Submit Flow Monitoring Results Technical Memorandum (TM-1) <br />7 TASK C MODEL DEVELOPMENT <br />8 Conduct Gap Analysis to Review Network Connectivity and Identify Data <br />Needs <br />9 Develop Protocol to Populate Missing Data for Model Development <br />1 D Import GIS Data into Model and Conduct Detailed Model Network Review <br />11 Assign Hydraulic Information to Model <br />12 Incorporate Detailed Lift Station Data <br />13 sewer Basin Delineation and Subcatchment Generation <br />14 Conduct Data Flagging & Prepare Geodatabases for Submittal to City <br />15 Submit Model Development Technical Memorandum (TM -2) <br />167- Workshop M1 Review Flow Monitoring (TM -1) and Model Development <br />(TM -2) <br />17 TASK D: WASTEWATER SYSTEM MODEL CALIBRATION <br />t8 Existing Wastewater Flow Data Importation into the Model <br />19 Dry Weather Calibration <br />20 Wet Weather Calibration <br />21 — Submit Model Calibration Technical Memorandum (TM -3) <br />22 <br />Workshop #2 Review Model Calibration (TM -3) and Input for <br />Comprehensive Plan <br />5i- 318 <br />7127 <br />f <br />♦ 8117 <br />* 8129 <br />1112 <br />* 11114 <br />