My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1999-087
San-Marcos
>
City Clerk
>
03 Resolutions
>
1990 s
>
1999
>
Res 1999-087
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2006 10:43:33 AM
Creation date
8/22/2006 10:43:16 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
1999-87
Date
4/12/1999
Volume Book
136
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. Is this your principall"omestead'7 <br />- Number of persons :iving in household <br />- Household income level <br />- Cost 01 flood-related repairs <br />- Market value of home before the flood <br />- Cost of mitigation (raising or removing home from floodplain) <br />- Percent of flood related repairs covered by insurance <br />- Other federal, state, local or private assistance received for the repair / miti"ation 01 heuse <br /> <br />2. Staff verification of accuracy of information and eligibility for assistance <br /> <br />3. Staff prepares environmental clearances required by HUD <br /> <br />Notification of Assistance and Disbursements <br /> <br />1. Staff notifies the applicant by phone and mail of determination regarding eligibility <br /> <br />2. If person is eligible, the amount of the assistance grant is determined (see below) <br /> <br />3. Disbursements can either be: <br />- directly to the mitigation contractor upon submital of invoices of work completed and verification by <br />staff that the work was performed, or <br /> <br />- directly to the homeowner as a reimbursement of costs paid by the owner to a mitigation contractor <br />after providing proof of work completed, or <br /> <br />- directly to the homeowner with verification of materials costs associated with the mitigation effort <br />(labor hours are not reimbursable unless billed by a contractor) <br /> <br />Maximum Flood Mitigation Assistance Available Per House <br /> <br />1. Assistance to raise mobile homes - 55,000 maximum <br /> <br />2. Assistance to raise houses on pier and beam - $ 15,000 maximum <br /> <br />3. Assistance to raise houses constructed on monolithic slabs - 525,000 maximum <br /> <br />4. Surveying costs to verify floodplain elevation / compliance certificate. S1.000 per house / mebile home <br />maximum <br /> <br />5. Purchase of lot / structure (as is) - 515,000 maximum <br /> <br />6. Assistance with demolition costs (where the flooded home is to be removed) - 55.CeO maximum <br /> <br />7. Assistance with raising services to a newly elevated house - 52,000 maximum <br /> <br />8. Assistance with moving the house to a lot located outside of the floodplain. $15,000 maximcrT", <br /> <br />Note: A maximum of $339,350 is available in the San Marcos Flood Mitigation Assistance Program. <br /> <br />Funding will be distributed until the total amount is expended. <br />
The URL can be used to link to this page
Your browser does not support the video tag.