My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord 2012-015
San-Marcos
>
City Clerk
>
02 Ordinances
>
2010's
>
2012
>
Ord 2012-015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2014 1:42:19 PM
Creation date
4/6/2012 3:40:20 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Ordinances
City Clerk - Type
Amending
Number
2012-15
Date
4/3/2012
Volume Book
194
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SAN MARCOS ELECTRIC RULES AND REGULATIONS <br />(e) inspect wirings <br />(f) take other action related to supple service to the customer. <br />(E) A customer's service connections must be readily accessible to the CitL's <br />service facilities. The City shall determine a service connection point based on the most <br />direct route to City facilities. The City may relocate a service connection point if the City <br />determines relocation is necessary. <br />(F) A customer must reimburse the City for all costs incurred by the City resulting <br />from the failure or refusal of the customer to comply with this section. <br />((-,) The City may disconnect utility service if a customer fails to maintain the <br />customer's property as required by this section. The City is not liable for damage to the <br />customer's property caused by City authorized maintenance of a right -of -way or meter <br />installation_ <br />PAYMENT OF BILLS <br />A. Payment <br />Bills for service will be based upon the metered consumption as billed under the <br />applicable rate schedule. They will be rendered at regular intervals, and are due <br />and payable within fifteen eighteen (148) days from the date of issuance of the <br />bill. The customer will pay the net amount of the bill if paid on or before the due <br />date. All other bills are due on presentation. <br />feeeiN,ed withifi thioy (30) days 4em r-eeeipt of bill. and any unpaid affieLifit 'A44 <br />be sal} eet to a 1 / pef- „th i nteFest ehar <br />Payments of charges for connection or reconnection of service and payments of <br />initial deposits or reinstated deposits as required under the Rules and Regulations <br />of the City shall be made before service will be connected or disconnected. <br />For other information concerning assistance in paying a bill, customers should <br />contact the City's electric utility office. <br />INSTALLATION ON CUSTOMER ' S PREMISES <br />A. Meters, Transformers and Other Equipment <br />All meters, transformers, regulators, services, fixtures, etc., which are installed by <br />the City upon the customer's premises for the purpose of delivering electricity to <br />the customer remain the property of the city and may be repaired, replaced or <br />removed by the City at any time. <br />No rent or other charge whatsoever will be made by the customer against the city <br />for placing or maintaining said meters, transformers, regulators, fixtures, etc., <br />upon the customer's premises. <br />B. Installations <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.